1. |
The organization as part of its monitoring and control policy may have a ________in place which dictates that certain statistics have to be collected at various stages of aproject. |
A. | measurement programme. |
B. | system programme. |
C. | software programme. |
D. | testing programme. |
Answer» B. system programme. | |
2. |
________ is needed to ensure that the project remains under control and that it continues to meet its business justification. |
A. | yellow tape. |
B. | white tape. |
C. | red tape. |
D. | black tape. |
Answer» D. black tape. | |
3. |
________ is some thing that is described by a set of attributes (data items) and that will be manipulated within the software (system). |
A. | instance. |
B. | class. |
C. | object. |
D. | data. |
Answer» D. data. | |
4. |
A _________ contains a set of attributes that act as an aspect, quality, characteristic, or descriptor of the object. |
A. | ordinary object. |
B. | data object. |
C. | template. |
D. | instance. |
Answer» C. template. | |
5. |
_______ refers to the ability of the software to interact with other systems. |
A. | interoperability. |
B. | reliability. |
C. | functionality. |
D. | efficiency. |
Answer» B. reliability. | |
6. |
_______ is a qualitative measure of the degree to which classes are connected to one another. |
A. | cohesion. |
B. | coupling. |
C. | control. |
D. | coordination. |
Answer» C. control. | |
7. |
A ________ specification is concerned with how much is to spent on the system. |
A. | functional. |
B. | quality. |
C. | resource. |
D. | scope. |
Answer» D. scope. | |
8. |
A ________ specification is concerned with how well the functions are to operate. |
A. | functional. |
B. | quality. |
C. | resource. |
D. | scope. |
Answer» C. resource. | |
9. |
In _________ stage, the entry, exit and process requirements are identified for each activity. |
A. | review and publicize plan. |
B. | identify project scope and objectives. |
C. | analyse project. |
D. | identify the products and activities of the project. |
Answer» E. | |
10. |
The problems experienced in the survey of managers published by Thayer, Pyster and Wood include_________. |
A. | poor estimates and plans. |
B. | poor role definition. |
C. | poor quality control. |
D. | both a and b. |
Answer» E. | |
11. |
When a customer does not identify a detailed input, processing or output requirements, _______ model is used. |
A. | prototyping. |
B. | rad. |
C. | incremental. |
D. | spiral. |
Answer» B. rad. | |
12. |
..is called if subsequent have the time by which an activity may be delayed without affecting. |
A. | action float. |
B. | terminal float. |
C. | free float |
D. | null float |
Answer» D. null float | |
13. |
Zero duration activities but are assumed to start at the same time as the first and the end at the same time as the last one is called__________ activity. |
A. | hijacked. |
B. | heuristic. |
C. | hammocked. |
D. | hole. |
Answer» D. hole. | |
14. |
_________ activities on the network diagram have zero duration and use no resources. |
A. | dangling. |
B. | dummy. |
C. | null. |
D. | zero. |
Answer» C. null. | |
15. |
____ is carried out to calculate the earliest dates on which each activity may be started and completed. |
A. | backward pass. |
B. | forward pass. |
C. | no pass. |
D. | increasing pass. |
Answer» C. no pass. | |
16. |
The activities have zero duration but are assumed to start at the sametime as the first and the end at the same time as the last one iscalled__________ activity. |
A. | hijacked. |
B. | heuristic. |
C. | hammocked. |
D. | hole. |
Answer» D. hole. | |
17. |
________ a set of attributes (data items) and that will be manipulated within the software (system). |
A. | instance. |
B. | class. |
C. | object. |
D. | data. |
Answer» D. data. | |
18. |
__________ relates to the physical resources used when the software is executed. |
A. | functionality. |
B. | maintainability. |
C. | reliability. |
D. | efficiency. |
Answer» E. | |
19. |
Which type of risk factor is most likely to cause problems for a software project developing commercial software? |
A. | inadequate user documentation. |
B. | litigation expense. |
C. | low productivity. |
D. | cancellation of project. |
Answer» B. litigation expense. | |
20. |
_________ indicates the connectedness of the system that can be derived mechanically. |
A. | dependency. |
B. | re-occurrence. |
C. | inheritance |
D. | relationship. |
Answer» E. | |
21. |
The time by which an activity may be delayed without affecting any subsequent activity is called _________. |
A. | action float. |
B. | terminal float. |
C. | free float |
D. | null float |
Answer» D. null float | |
22. |
The objective of ________ is to avoid or minimize the adverse effects of unforeseen events. |
A. | risk management. |
B. | risk maintenance. |
C. | risk taking. |
D. | risky job. |
Answer» B. risk maintenance. | |
23. |
Which form of software development model is most suited to a systemwhere all the requirements are known at the start of a project and remainstable throughout the project? |
A. | waterfall model. |
B. | incremental model. |
C. | evolutionary model. |
D. | spiral model. |
Answer» B. incremental model. | |
24. |
__________ relates to the ability of the software to be transferred to a different environment. |
A. | portability. |
B. | maintainability. |
C. | reliability. |
D. | efficiency. |
Answer» B. maintainability. | |
25. |
Ensuring that all the loose ends of a project are tied up is called as ___________. |
A. | demanding. |
B. | decomposing. |
C. | determining. |
D. | decommissioning. |
Answer» E. | |
26. |
The percentage of a particular time interval that a system is usable is called _____. |
A. | time interval. |
B. | availability. |
C. | utility. |
D. | mean time. |
Answer» C. utility. | |
27. |
"Each activity has been scheduled to start at its earliest start date" is called as_________. |
A. | likelihood. |
B. | activity schedule. |
C. | probability. |
D. | planning. |
Answer» B. activity schedule. | |
28. |
The shortest time in which we could expect to complete the activity, barring outright miracles are called ________. |
A. | optimistic time. |
B. | pessimistic time. |
C. | most likely time. |
D. | shortest time. |
Answer» B. pessimistic time. | |
29. |
In Software Prototype, ___________ means copies of input screens are shown to the users on a workstation, but the screens cannot actually be used. |
A. | simulation. |
B. | annealing. |
C. | mock-ups. |
D. | rad system. |
Answer» D. rad system. | |
30. |
The inspection is led by ________, who has had specific training in the technique. |
A. | an evaluator. |
B. | a testing professional. |
C. | a moderator. |
D. | a reader. |
Answer» D. a reader. | |
31. |
An Elaboration of Waterfall which stresses the necessity for validation activities is known as __________. |
A. | extended waterfall. |
B. | iterative model. |
C. | v-process model. |
D. | spiral model. |
Answer» D. spiral model. | |
32. |
_______ is a working model of one or more aspects of the projected system. |
A. | evolutionary model. |
B. | v-process model. |
C. | spiral model. |
D. | software prototyping. |
Answer» E. | |
33. |
Ranking of the risks and determining risk aversion strategies is called ________. |
A. | risk analysis. |
B. | risk control. |
C. | risk identification |
D. | risk evaluation. |
Answer» E. | |
34. |
_______ is an activity bar chart indicating scheduled activity dates and durations frequently augmented with activity floats. |
A. | bar chart. |
B. | ball chart. |
C. | slip chart. |
D. | gantt chart. |
Answer» B. ball chart. | |
35. |
Ranking of the risks and determining risk aversion strategies is called _______. |
A. | risk analysis. |
B. | risk control. |
C. | risk identification. |
D. | risk evaluation. |
Answer» E. | |
36. |
The priorities we might apply in deciding levels in monitoring is called as ______. |
A. | hierarchical monitoring. |
B. | prioritized monitoring. |
C. | tracking. |
D. | tracing |
Answer» C. tracking. | |
37. |
The activities have zero duration but are assumed to start at the same timeas the first and the end at the same time as the last one is called__________activity. |
A. | hijacked. |
B. | heuristic. |
C. | hammocked. |
D. | hole. |
Answer» D. hole. | |
38. |
_________ activities on the network diagram have zero duration and use no resources. |
A. | dangling. |
B. | dummy. |
C. | null. |
D. | zero. |
Answer» C. null. | |
39. |
The statement "Putting more people on a late job makes it later" is from _________ law. |
A. | brooks. |
B. | peters. |
C. | parkinson s. |
D. | brokers. |
Answer» B. peters. | |
40. |
In _________, the priority activities are allocated resources in ascending order of total. float. |
A. | total free. |
B. | total float. |
C. | technical float. |
D. | top float. |
Answer» C. technical float. | |
41. |
. The scope of the deliverables for an increment is rigidly constrained by an agreed deadline called as ____________. |
A. | sand boxing. |
B. | time boxing. |
C. | time delaying. |
D. | local delaying. |
Answer» C. time delaying. | |
42. |
PERT is _________. |
A. | process evaluation and review technique. |
B. | product evaluation and review technique. |
C. | program evaluation and review technique. |
D. | project evaluation and review technique. |
Answer» D. project evaluation and review technique. | |
43. |
_______ refers to the ability of the software to interact with othersystems. |
A. | interoperability. |
B. | reliability. |
C. | functionality. |
D. | efficiency. |
Answer» B. reliability. | |
44. |
_________ is a technique particularly associated with quality circles. |
A. | quality plans. |
B. | fire- fighting. |
C. | quality checking. |
D. | brain storming. |
Answer» E. | |
45. |
_______ is classified into Functional and Non-functional. |
A. | project. |
B. | requirements. |
C. | start date. . |
D. | risk |
Answer» C. start date. . | |
46. |
The priorities we might apply in deciding levels in monitoring is called as______. |
A. | hierarchical monitoring. |
B. | prioritized monitoring. |
C. | tracking. |
D. | tracing |
Answer» C. tracking. | |
47. |
Which form of software development model is most suited to a systemwhere all the requirements are known at the start of a project and remainstable throughout the project? |
A. | waterfall model. |
B. | incremental model. |
C. | evolutionary model. |
D. | spiral model. |
Answer» B. incremental model. | |
48. |
CMM is acronym of __________. |
A. | capability maturity model. |
B. | calculative maturity model. |
C. | collaborative maturity model. |
D. | continuous maturity model. |
Answer» B. calculative maturity model. | |
49. |
The inspection is led by ________, who has had specific training in thetechnique. |
A. | an evaluator. |
B. | a testing professional. |
C. | a moderator. |
D. | a reader. |
Answer» D. a reader. | |
50. |
__________ relates to the ability of the software to be transferred to adifferent environment. |
A. | portability. |
B. | maintainability. |
C. | reliability. |
D. | efficiency. |
Answer» B. maintainability. | |