

MCQOPTIONS
Saved Bookmarks
1. |
. The scope of the deliverables for an increment is rigidly constrained by an agreed deadline called as ____________. |
A. | sand boxing. |
B. | time boxing. |
C. | time delaying. |
D. | local delaying. |
Answer» C. time delaying. | |