| 101. |
Software Configuration Management can be administered in several ways. These include |
| A. | a single software configuration management team for the whole organization |
| B. | a separate configuration management team for each project |
| C. | software configuration management distributed among the project members |
| D. | all of the mentioned |
| Answer» B. a separate configuration management team for each project | |
| 102. |
4 COST MONITORING |
| A. | baselines |
| B. | source code |
| C. | data model |
| D. | none of the mentioned |
| Answer» B. source code | |
| 103. |
SPMP stands for |
| A. | software project manager’s plan |
| B. | software project management plan |
| C. | software product management plan |
| D. | software product manager’s plan |
| Answer» C. software product management plan | |
| 104. |
Which of the following is not a sign that indicates that an information systems project is in jeopardy? |
| A. | software people don’t understand their customers needs |
| B. | changes are managed poorly |
| C. | sponsorship is gained |
| D. | users are resistant |
| Answer» D. users are resistant | |
| 105. |
Which activity sits at the core of software requirements analysis? |
| A. | problem decomposition |
| B. | partitioning |
| C. | problem elaboration |
| D. | all of the mentioned |
| Answer» E. | |
| 106. |
Which of the following is not a project factor that should be considered when planning the structure of software engineering teams? |
| A. | the difficulty of the problem to be solved |
| B. | high frustration caused by personal, business, or technological factors that causes friction among team members |
| C. | the degree of sociability required for the project |
| D. | the rigidity of the delivery date |
| Answer» D. the rigidity of the delivery date | |
| 107. |
Commitments to unrealistic time and resource estimates may result in |
| A. | project delay |
| B. | poor quality work |
| C. | project failure |
| D. | all of the mentioned |
| Answer» E. | |
| 108. |
Which software engineering team has no permanent leader? |
| A. | controlled decentralized (cd) |
| B. | democratic decentralized (dd) |
| C. | controlled centralized (cc) |
| D. | none of the mentioned |
| Answer» C. controlled centralized (cc) | |
| 109. |
Which of the following is a collection of project coordination technique? |
| A. | formal approaches |
| B. | formal, interpersonal procedures |
| C. | informal, interpersonal procedures |
| D. | all of the mentioned |
| Answer» E. | |
| 110. |
Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks? |
| A. | controlled decentralized (cd) |
| B. | democratic decentralized (dd) |
| C. | controlled centralized (cc) |
| D. | none of the mentioned |
| Answer» B. democratic decentralized (dd) | |
| 111. |
Which of the following is not an effective project manager trait? |
| A. | problem solving |
| B. | managerial identity |
| C. | influence and team building |
| D. | none of the mentioned |
| Answer» E. | |
| 112. |
Which paradigm relies on the natural compartmentalization of a problem and organizes team members to work on pieces of the problem with little active communication among themselves? |
| A. | random paradigm |
| B. | open paradigm |
| C. | closed paradigm |
| D. | synchronous paradigm |
| Answer» D. synchronous paradigm | |
| 113. |
Who interacts with the software once it is released for production use? |
| A. | end-users |
| B. | client |
| C. | project (technical) managers |
| D. | senior managers |
| Answer» B. client | |
| 114. |
Which of the following is not an approach to software cost estimation? |
| A. | empirical |
| B. | heuristic |
| C. | analytical |
| D. | critical |
| Answer» E. | |
| 115. |
Which paradigm structures a team loosely and depends on individual initiative of the team members? |
| A. | random paradigm |
| B. | open paradigm |
| C. | closed paradigm |
| D. | synchronous paradigm |
| Answer» E. | |
| 116. |
Which of the following is a people- intensive activity? |
| A. | problem solving |
| B. | organization |
| C. | motivation |
| D. | project management |
| Answer» E. | |
| 117. |
Which of the following paradigm attempts to structure a team in a manner that achieves some of the controls associated with the closed paradigm but also much of the innovation that occurs when using the random paradigm? |
| A. | asynchronous paradigm |
| B. | open paradigm |
| C. | closed paradigm |
| D. | synchronous paradigm |
| Answer» C. closed paradigm | |
| 118. |
Who delivers the technical skills that are necessary to engineer a product or an application? |
| A. | practitioners |
| B. | project managers |
| C. | senior managers |
| D. | none of the mentioned |
| Answer» B. project managers | |
| 119. |
A software                  provides the framework from which a comprehensive plan for software development can be established. |
| A. | people |
| B. | product |
| C. | process |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 120. |
Who defines the business issues that often have significant influence on the project? |
| A. | practitioners |
| B. | project managers |
| C. | senior managers |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 121. |
Which of the following is not a project manager’s activity? |
| A. | project control |
| B. | project management |
| C. | project planning |
| D. | project design |
| Answer» E. | |
| 122. |
PM-CMM stands for |
| A. | people management capability maturity model |
| B. | process management capability maturity model |
| C. | product management capability maturity model |
| D. | project management capability maturity model |
| Answer» B. process management capability maturity model | |
| 123. |
2 COLLECTION OF DATA |
| A. | people |
| B. | product |
| C. | popularity |
| D. | process |
| Answer» D. process | |
| 124. |
Project management involves the planning, monitoring, and control of the people, process, and events that occur as software evolves from a preliminary concept to an operational implementation. |
| A. | true |
| B. | false |
| Answer» B. false | |
| 125. |
Synchronization techniques will be necessary to address the various challenges of harmonising. |
| A. | false |
| B. | true |
| Answer» C. | |
| 126. |
Which will reduce the energy expenditure? |
| A. | clustering |
| B. | software agents |
| C. | synchronization techniques |
| D. | cluster, software agent, and synchronization techniques |
| Answer» B. software agents | |
| 127. |
What is the role of communication protocol in IoT? |
| A. | smart cities |
| B. | cyber physical system |
| C. | mac layer issue |
| D. | managing energy |
| Answer» D. managing energy | |
| 128. |
Resource management includes |
| A. | iot devices |
| B. | iot cloud |
| C. | iot networks |
| D. | iot web |
| Answer» C. iot networks | |
| 129. |
Which of the following is the future application of IoT? |
| A. | role of green iot system |
| B. | qos in communication |
| C. | secure communication |
| D. | multimedia communication |
| Answer» B. qos in communication | |
| 130. |
Resource management will elaborate the key aspects of |
| A. | industrial management |
| B. | energy management |
| C. | network management |
| D. | information management |
| Answer» D. information management | |
| 131. |
Managing of resources can be done by implementing |
| A. | protocols |
| B. | algorithms |
| C. | networks |
| D. | protocols and algorithms |
| Answer» E. | |
| 132. |
What type of networks is interacting under IoT? |
| A. | heterogeneous only |
| B. | homogeneous only |
| C. | both hetero and homogeneous |
| D. | neither hetero nor homo |
| Answer» B. homogeneous only | |
| 133. |
In                    the embedded devices and objects working under IoT are resource constrained. |
| A. | health |
| B. | industry |
| C. | home |
| D. | information system |
| Answer» E. | |
| 134. |
                   will enable the humans to access, control and manage the operation. |
| A. | iot |
| B. | bigdata |
| C. | network |
| D. | communication |
| Answer» B. bigdata | |
| 135. |
What is the popular method of organizing wireless network topologies? |
| A. | software |
| B. | synchronization |
| C. | network |
| D. | cluster |
| Answer» E. | |
| 136. |
Which of the following can be referred to as applications of Randomized algorithm? |
| A. | quicksort |
| B. | min cut |
| C. | verifying matrix multiplication |
| D. | all of the mentioned |
| Answer» E. | |
| 137. |
Which of the following can be solved in computer science? |
| A. | p=bpp problem |
| B. | np=co-np problem |
| C. | do one way problems exist? |
| D. | all of the mentioned |
| Answer» E. | |
| 138. |
Unix sort command uses                    as its sorting technique. |
| A. | quick sort |
| B. | bucket sort |
| C. | radix sort |
| D. | merge sort |
| Answer» B. bucket sort | |
| 139. |
Prisonner’s dilemma can be related to the following: |
| A. | cooperative behaviour |
| B. | graph theory |
| C. | both (a) and (b) |
| D. | none of the mentioned |
| Answer» B. graph theory | |
| 140. |
Which of the following algorithms are probably correct as well as fast? |
| A. | las vegas algorithm |
| B. | monte carlo algorithm |
| C. | atlantic city algorithm |
| D. | all of the mentioned |
| Answer» D. all of the mentioned | |
| 141. |
Which of the following are probalistic algorithms? |
| A. | las vegas algorithm |
| B. | monte carlo algorithm |
| C. | atlantic city algorithm |
| D. | all of the mentioned |
| Answer» E. | |
| 142. |
A randomized algorithm uses random bits as input inorder to achieve a                            good performance over all possible choice of random bits. |
| A. | worst case |
| B. | best case |
| C. | average case |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 143. |
The difference between the maximum time available and the actual time needed to perform an activity is known as |
| A. | free float |
| B. | independent float |
| C. | total float |
| D. | half float |
| Answer» D. half float | |
| 144. |
According to the time estimates made by the PERT planners, the maximum time that would be needed to complete an activity is called as |
| A. | the most likely time estimate |
| B. | optimistic time estimate |
| C. | pessimistic time estimate |
| D. | expected time estimate |
| Answer» D. expected time estimate | |
| 145. |
In a network, a critical path is the time- wise shortest path. |
| A. | true |
| B. | false |
| Answer» C. | |
| 146. |
The shortest possible time in which an activity can be achieved under ideal circumstances is known as |
| A. | pessimistic time estimate |
| B. | optimistic time estimate |
| C. | expected time estimate |
| D. | the most likely time estimate |
| Answer» C. expected time estimate | |
| 147. |
A PERT network is activity-oriented while a CPM network is event-oriented. |
| A. | true |
| B. | false |
| Answer» C. | |
| 148. |
                   are used to represent activity in a network diagram. |
| A. | circles |
| B. | squares |
| C. | rectangles |
| D. | arrows |
| Answer» E. | |
| 149. |
In bar charts, which colour is used to show the actual progress? |
| A. | red |
| B. | black |
| C. | blue |
| D. | green |
| Answer» E. | |
| 150. |
The full form of CPM is |
| A. | critical path method |
| B. | control path method |
| C. | critical plan management |
| D. | control path management |
| Answer» B. control path method | |