| 51. |
Why is Software architecture so important? |
| A. | communication among stakeholders |
| B. | early design decisions |
| C. | transferable abstraction of a system |
| D. | all of the mentioned |
| Answer» E. | |
| 52. |
Which regression test selection technique exposes faults caused by modifications? |
| A. | efficiency |
| B. | precision |
| C. | generality |
| D. | inclusiveness |
| Answer» E. | |
| 53. |
Why is software architecture called vehicle for stakeholder communication? |
| A. | each stakeholder of a software system is concerned with different characteristics of the system affected by architecture |
| B. | architecture provides a common language in which different concerns can be expressed |
| C. | all of the mentioned |
| D. | none of the mentioned |
| Answer» E. | |
| 54. |
                             measures the ability of a regression test selection technique to handle realistic applications. |
| A. | efficiency |
| B. | precision |
| C. | generality |
| D. | inclusiveness |
| Answer» D. inclusiveness | |
| 55. |
Which selective retest technique selects every test case that causes a modified program to produce a different output than its original version? |
| A. | coverage |
| B. | minimization |
| C. | safe |
| D. | maximization |
| Answer» D. maximization | |
| 56. |
Regression testing is a very expensive activity. |
| A. | true |
| B. | false |
| Answer» B. false | |
| 57. |
Selective retest techniques may be more economical than the “retest- allâ€technique.How many selective retest techniques are there? |
| A. | two |
| B. | three |
| C. | four |
| D. | five |
| Answer» C. four | |
| 58. |
What type of software testing is generally used in Software Maintenance? |
| A. | regression testing |
| B. | system testing |
| C. | integration testing |
| D. | unit testing |
| Answer» B. system testing | |
| 59. |
How many phases are there in Taute Maintenance Model? |
| A. | six |
| B. | seven |
| C. | eight |
| D. | nine |
| Answer» D. nine | |
| 60. |
The modification of the software to match changes in the ever changing environment, falls under which category of software maintenance? |
| A. | corrective |
| B. | adaptive |
| C. | perfective |
| D. | preventive |
| Answer» C. perfective | |
| 61. |
Software Maintenance includes |
| A. | error corrections |
| B. | enhancements of capabilities |
| C. | deletion of obsolete capabilities |
| D. | all of the mentioned |
| Answer» E. | |
| 62. |
Which of the following can be the factor of safety for shock loading? |
| A. | 11 |
| B. | 13 |
| C. | 4 |
| D. | 7 |
| Answer» C. 4 | |
| 63. |
Which of these interviews is taken for a candidate far away? |
| A. | lunch interview |
| B. | telephone |
| C. | stress interview |
| D. | group interview |
| Answer» C. stress interview | |
| 64. |
In which of these, more than one candidate is interviewed? |
| A. | the behavioural interview |
| B. | the stress interview |
| C. | the group interview |
| D. | the audition |
| Answer» D. the audition | |
| 65. |
Which of these interviews is adapted for computer programmers? |
| A. | the stress interview |
| B. | the group interview |
| C. | the screening interview |
| D. | the audition |
| Answer» E. | |
| 66. |
In which of these interviews, insults are common? |
| A. | screening interview |
| B. | stress interview |
| C. | behavioural interview |
| D. | group interview |
| Answer» C. behavioural interview | |
| 67. |
How many styles are used in a screening interview? |
| A. | two |
| B. | five |
| C. | three |
| D. | four |
| Answer» B. five | |
| 68. |
Which kind of interview includes a process in which the employability of the job applicant is evaluated? |
| A. | stress interview |
| B. | screening interview |
| C. | group interview |
| D. | behavioural interview |
| Answer» C. group interview | |
| 69. |
All job interviews have the same objective. |
| A. | true |
| B. | false |
| Answer» B. false | |
| 70. |
A job interview is a formal meeting between a job seeker and an employer. |
| A. | true |
| B. | false |
| Answer» B. false | |
| 71. |
Interviews are conversations with |
| A. | fun |
| B. | purpose |
| C. | friendliness |
| D. | informality |
| Answer» C. friendliness | |
| 72. |
Which of the following is not an effective software project management focus? |
| A. | people |
| B. | product |
| C. | popularity |
| D. | process |
| Answer» D. process | |
| 73. |
                               contract is one that has automatic renewals until one party requests termination. |
| A. | uniform |
| B. | evergreen |
| C. | moderate |
| D. | on-demand |
| Answer» C. moderate | |
| 74. |
Which is a software configuration management concept that helps us to control change without seriously impeding justifiable change? |
| A. | baselines |
| B. | source code |
| C. | data model |
| D. | none of the mentioned |
| Answer» B. source code | |
| 75. |
The Capability Maturity Model (CMM) is a continuous model. |
| A. | true |
| B. | false |
| Answer» C. | |
| 76. |
The CMMI assessment is based on a x- point scale. What is the value of x? |
| A. | 0 |
| B. | 2 |
| C. | 4 |
| D. | 6 |
| Answer» E. | |
| 77. |
What is often undefined and is left to the ingenuity of the project managers and engineers? |
| A. | role |
| B. | exception |
| C. | activity |
| D. | process |
| Answer» C. activity | |
| 78. |
Which of the following is not a part of process change? |
| A. | introducing new practices, methods or processes |
| B. | introducing new team members to existing project |
| C. | introducing or removing deliverable |
| D. | introducing new roles or responsibilities |
| Answer» C. introducing or removing deliverable | |
| 79. |
What is a tangible output of an activity that is predicted in a project plan? |
| A. | deliverable |
| B. | activity |
| C. | condition |
| D. | process |
| Answer» B. activity | |
| 80. |
It is always best to start process analysis with a new test model. |
| A. | true |
| B. | false |
| Answer» C. | |
| 81. |
The documentation of a process which records the tasks, the roles and the entities used is called |
| A. | process metric |
| B. | process analysis |
| C. | process modelling |
| D. | none of the mentioned |
| Answer» D. none of the mentioned | |
| 82. |
Prototypes and 4GL business systems are categorized under which process? |
| A. | informal |
| B. | managed |
| C. | methodical |
| D. | supported |
| Answer» B. managed | |
| 83. |
In which stage of process improvement bottlenecks and weaknesses are identified? |
| A. | process measurement |
| B. | process analysis |
| C. | process change |
| D. | none of the mentioned |
| Answer» C. process change | |
| 84. |
How many stages are there in process improvement? |
| A. | three |
| B. | four |
| C. | five |
| D. | six |
| Answer» B. four | |
| 85. |
Process improvement is the set of activities, methods, and transformations that developers use to develop and maintain information systems. |
| A. | true |
| B. | false |
| Answer» C. | |
| 86. |
A sequence of baselines representing different versions of a system is known as |
| A. | system building |
| B. | mainline |
| C. | software configuration item(sci) |
| D. | none of the mentioned |
| Answer» C. software configuration item(sci) | |
| 87. |
Which of the following is a part of system release? |
| A. | electronic and paper documentation describing the system |
| B. | packaging and associated publicity that have been designed for that release |
| C. | an installation program that is used to help install the system on target hardware |
| D. | all of the mentioned |
| Answer» E. | |
| 88. |
Which of the following is a configuration item? |
| A. | design & test specification |
| B. | source code |
| C. | log information |
| D. | all of the mentioned |
| Answer» E. | |
| 89. |
“Robustness†answers which of the following description? |
| A. | case tools be used to support the process activities |
| B. | process errors are avoided or trapped before they result in product errors |
| C. | defined process is acceptable and usable by the engineers responsible for producing the software |
| D. | process continues in spite of unexpected problems |
| Answer» E. | |
| 90. |
Which method recommends that very frequent system builds should be carried out with automated testing to discover software problems? |
| A. | agile method |
| B. | parallel compilation method |
| C. | large systems method |
| D. | all of the mentioned |
| Answer» B. parallel compilation method | |
| 91. |
Which of the following is not a Version management feature? |
| A. | version and release identification |
| B. | build script generation |
| C. | project support |
| D. | change history recording |
| Answer» C. project support | |
| 92. |
Which of the following is not a build system feature? |
| A. | minimal recompilation |
| B. | documentation generation |
| C. | storage management |
| D. | reporting |
| Answer» D. reporting | |
| 93. |
Which of the following process is concerned with analyzing the costs and benefits of proposed changes? |
| A. | change management |
| B. | version management |
| C. | system building |
| D. | release management |
| Answer» B. version management | |
| 94. |
Which of the following process ensures that versions of systems and components are recorded and maintained? |
| A. | codeline |
| B. | configuration control |
| C. | version |
| D. | workspace |
| Answer» C. version | |
| 95. |
What involves preparing software for external release and keeping track of the system versions that have been released for customer use? |
| A. | system building |
| B. | release management |
| C. | change management |
| D. | version management |
| Answer» C. change management | |
| 96. |
Which of the following is not a Software Configuration Management Activity? |
| A. | configuration item identification |
| B. | risk management |
| C. | release management |
| D. | branch management |
| Answer» C. release management | |
| 97. |
The definition and use of configuration management standards is essential for quality certification in |
| A. | iso 9000 |
| B. | cmm |
| C. | cmmi |
| D. | all of the mentioned |
| Answer» E. | |
| 98. |
What complements the formal technical review by assessing a configuration object for characteristics that are generally not considered during review? |
| A. | software configuration audit |
| B. | software configuration management |
| C. | baseline |
| D. | none of the mentioned |
| Answer» B. software configuration management | |
| 99. |
What combines procedures and tools to manage different versions of configuration objects that are created during the software process? |
| A. | change control |
| B. | version control |
| C. | scis |
| D. | none of the mentioned |
| Answer» C. scis | |
| 100. |
Which of the following option is not tracked by configuration management tools? |
| A. | tracking of change proposals |
| B. | storing versions of system components |
| C. | tracking the releases of system versions to customers |
| D. | none of the mentioned |
| Answer» E. | |