This section includes 94 Mcqs, each offering curated multiple-choice questions to sharpen your Bachelor of Business Administration (BBA) knowledge and support exam preparation. Choose a topic below to get started.
1. |
If inputs decrease while output remains constant, what will happen to productivity? |
A. | ) it will increase |
B. | it will decrease |
C. | it will remain the same |
D. | it is impossible to tell |
Answer» B. it will decrease | |
2. |
.is the management of all activities directly related to the production of goods and services |
A. | productionmanagement |
B. | finance control |
C. | employee development |
D. | all of these |
Answer» B. finance control | |
3. |
refers to the verification of and confirmation towards the requirements of an entity. |
A. | inspection. |
B. | pricing. |
C. | alteration. |
D. | none of these. |
Answer» B. pricing. | |
4. |
All of the following are differences between manufacturing and service operations EXCEPT |
A. | quality is more easily measured in service operations. |
B. | productivity is easier to measure in manufacturing operations |
C. | contact with customers is more prevalent with persons working in service operations. |
D. | accumulation or decrease in inventory of finished products is more |
Answer» B. productivity is easier to measure in manufacturing operations | |
5. |
is the sum all the observations and divided by the total number of observations? |
A. | median |
B. | mode |
C. | mean |
D. | none of these |
Answer» D. none of these | |
6. |
is the process of randomly inspecting a sample of goods and deciding whether to accept the entire lot based on the results |
A. | statistical process control. |
B. | acceptance sampling |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) | |
7. |
Walter Shewhart is listed among the most important people of POM because of his contributions to |
A. | assembly line production |
B. | measuring productivity in the service sector |
C. | statistical quality control |
D. | just-in-time inventory methods |
Answer» D. just-in-time inventory methods | |
8. |
The person most responsible for popularizing interchangeable parts in manufacturing was |
A. | eli whitney |
B. | whitney houston |
C. | sergio farmerson |
D. | lillian gilbreth |
Answer» B. whitney houston | |
9. |
This cost is the cost associated with measuring evaluating, or auditing products or services to assure conformance to quality standards and performance requirements |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | none of the above |
Answer» C. failure cost | |
10. |
is a system that is used to maintain a desired level of quality in a product or service. |
A. | economic ordering quantity |
B. | quality control |
C. | knowledge management |
D. | manpower planning |
Answer» C. knowledge management | |
11. |
is a graphical tool to analyse and time the small, physical actions of workers and machine in performing a routine, repetitive, worker- machine task so that idle time can be identified |
A. | activity chart |
B. | metrics |
C. | (a) and (b) |
D. | none of these |
Answer» B. metrics | |
12. |
This cost is the costs resulting from products or services not conforming to requirements or user needs. |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | none of the above |
Answer» D. none of the above | |
13. |
is the level of output volume for which total cost equals total revenues |
A. | profit |
B. | breakeven point |
C. | sales |
D. | all of these |
Answer» C. sales | |
14. |
. is a process of representing each item by a number, the digit of which indicates the group, the sub-group, the type and the dimension of the item. |
A. | codification |
B. | classification |
C. | duplication |
D. | none of these |
Answer» B. classification | |
15. |
.is a Manufacturing systems utilizing computer software programs that control the actual machine on the shop floor. |
A. | complex manufacturing |
B. | computer aided manufacturing |
C. | ( a )and (b) |
D. | none of these |
Answer» C. ( a )and (b) | |
16. |
..is the process of creating and using mathematical representations of management problems and organizations to predict outcomes of proposed courses of action |
A. | mathematical modelling |
B. | physical modelling |
C. | service queries |
D. | .none of these |
Answer» B. physical modelling | |
17. |
deals with decision-making related to production processes so that the resulting goods or services are produced according to specifications, in the amount and by the schedule demanded and out of minimum cost. |
A. | production management |
B. | marketing management |
C. | financemanagement |
D. | capital structure |
Answer» B. marketing management | |
18. |
is the degree to which the design specifications for a product or service are appropriate to its function and use, and the degree to which a product or service conforms to its design specifications |
A. | quantity |
B. | quality |
C. | price |
D. | cost |
Answer» C. price | |
19. |
is a process used to determine the maintenance requirements of any physical asset in its operating context? |
A. | reliability centered maintenance |
B. | preventive cost |
C. | unavoidable cost |
D. | none of these |
Answer» B. preventive cost | |
20. |
..is the application or techniques designed to establish the time for a qualified worker to carry out a specified job at a defined level or performance |
A. | work measurement |
B. | work delay |
C. | work atmosphere |
D. | none of these |
Answer» B. work delay | |
21. |
.is the part of an organization that produces the organization s physical goods and services. |
A. | operating system |
B. | marketing system |
C. | financial system |
D. | all of these |
Answer» B. marketing system | |
22. |
Which of the following is used for issuing materials to different production departments |
A. | material requisition |
B. | purchase requisition |
C. | purchase order |
D. | none of these |
Answer» B. purchase requisition | |
23. |
Stores department issues materials to the production department on the basis of |
A. | goodsreceived note |
B. | purchase requisition |
C. | stores requisition |
D. | material transfer note |
Answer» D. material transfer note | |
24. |
..starts from some data in the future and schedules the required operations in reverse sequence |
A. | scheduling |
B. | backward scheduling |
C. | forward scheduling |
D. | all of these |
Answer» C. forward scheduling | |
25. |
.is a time table for performing activities utilizing resources or allocating activities |
A. | scheduling |
B. | engineering |
C. | reporting |
D. | communication |
Answer» B. engineering | |
26. |
In this sampling plan, the inspection results of two sample sizes are used to decide whether to accept or reject the complete lot. |
A. | single sampling plan |
B. | double sampling plan |
C. | questionnaire |
D. | census investigation |
Answer» C. questionnaire | |
27. |
In , machines and other supporting services are located according to the processing sequence of the product |
A. | project lay out |
B. | product lay out |
C. | combination lay out |
D. | none of these |
Answer» C. combination lay out | |
28. |
.is the quantity that should be carried by the company so that production is not affected before the next deliver arrives. |
A. | minimum stock level |
B. | maximum stock level |
C. | re order level |
D. | all of these |
Answer» B. maximum stock level | |
29. |
The process of buying large quantities of items when its price is low so that tentative profits can be obtained by selling them at higher prices is called .. |
A. | speculative purchasing |
B. | group purchasing |
C. | tender purchasing |
D. | none of these |
Answer» B. group purchasing | |
30. |
Which of the following factor affects the choice of the plant location selection decision? |
A. | capital requirement. |
B. | government policy |
C. | climate conditions |
D. | all of these |
Answer» E. | |
31. |
Statistical inference applied to product quality: quality control charts are contributed by |
A. | w.a. shewart |
B. | h.f.dodge&h.g.roming |
C. | p.m.blacker& others |
D. | john mauchlly and j.p.eckert |
Answer» B. h.f.dodge&h.g.roming | |
32. |
Which one of the following is not a part of production planning and control? |
A. | follow-up |
B. | financial leverage |
C. | routing |
D. | scheduling |
Answer» C. routing | |
33. |
.refers to the process of creating new products or modifying the existing ones within a predetermined time frame and cost price |
A. | product design |
B. | product development |
C. | market development |
D. | none of these |
Answer» C. market development | |
34. |
refers to the development of the concept or idea of a product in terms of specifications which are required for transforming the idea in to product |
A. | product design |
B. | product development |
C. | (a) and (b) |
D. | none of these |
Answer» B. product development | |
35. |
is the process of determining which job to start first and in what order other jobs should be processed on the machine or in work centre |
A. | job sequencing |
B. | priority rules |
C. | batch production |
D. | none of these |
Answer» B. priority rules | |
36. |
In the case of . the products are produced as per the specifications of the customers within prefixed time and cost. |
A. | mass production |
B. | job production |
C. | both of these |
D. | none of these |
Answer» C. both of these | |
37. |
is the highest reasonable output rate which can be achieved with the current product specifications, product mix, work force, plant and equipment. |
A. | publicity |
B. | capacity |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) | |
38. |
..is the system in whichitems are processed in lots and a new lot is undertaken for production only when the production on all items of a lot is complete. |
A. | job production |
B. | batch production |
C. | mass production |
D. | none of these |
Answer» C. mass production | |
39. |
The layout in which all the equipment sperforming similar tasks are grouped together is called .. |
A. | )product lay out |
B. | process lay out |
C. | combination lay out |
D. | none of these |
Answer» C. combination lay out | |
40. |
is the capacity that specifies a theoretical upper limit above the usual rate of routine operations. |
A. | maximum capacity |
B. | effective capacity |
C. | actual capacity |
D. | none of these. |
Answer» B. effective capacity | |
41. |
.. is the configuration of departments, work centres and equipment in the conversion process. |
A. | plant lay out |
B. | plant locations |
C. | (a) and (b) |
D. | none of these. |
Answer» B. plant locations | |
42. |
The lay out in which production operation is performed in a fixed position is called . |
A. | project lay out |
B. | product lay out |
C. | (a) and(b) |
D. | none of these |
Answer» B. product lay out | |
43. |
is used to monitor characteristics that can be measured and have a continuum of values such as height, weight, volume etc. |
A. | control chart of attributes |
B. | control chart for variables |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) | |
44. |
..is used to monitor characteristics that have discrete values and can be counted |
A. | control chart for variables. |
B. | control chart for attributes |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) | |
45. |
..is an organized creative approach which has its objective, the efficient identification of unnecessary cost cost which provides neither quality nor use nor life nor appearance nor customer features. |
A. | money chain |
B. | value analysis |
C. | supply chain |
D. | none of these |
Answer» C. supply chain | |
46. |
..is a group of workers from the same area who usually meet to discuss their problems, investigate, recommend solutions and to corrective actions |
A. | quality problems |
B. | quality circle |
C. | quantify value |
D. | none of these |
Answer» C. quantify value | |
47. |
is the systematic recording and critical examination of existing and the proposed way of doing work as a means of developing effective methods. |
A. | method study |
B. | time study |
C. | time booking |
D. | none of these |
Answer» B. time study | |
48. |
Which of the following is not a characteristic of intermittent production system? |
A. | the flow of production is intermittent. |
B. | the volume of production is generally small. |
C. | a single product is manufactured in bulk. |
D. | none of these |
Answer» D. none of these | |
49. |
The risk or probability of incorrectly concluding that the conversion process is out of control. |
A. | type 1 error |
B. | type 2 errors |
C. | (a) and (b) |
D. | none of these |
Answer» B. type 2 errors | |
50. |
It is a chart where activities of more than subject (worker or equipment) are each recorded on a common time scale to show their inter-relationship. |
A. | single activity chart |
B. | multiple activity charts |
C. | charting |
D. | none of these |
Answer» C. charting | |