51. |
.involves theactivities relating to procuring materials and supplies consumed during production |
A. | selling |
B. | pricing |
C. | purchasing |
D. | distributing |
Answer» D. distributing | |
52. |
..are those materials and equipment s which have no immediate use but have accumulated due to faulty planning, forecasting and purchasing. |
A. | surplus items |
B. | deficit items |
C. | (a) and (b) |
D. | none of these |
Answer» B. deficit items | |
53. |
.is a priority rule that gives top priority to the waiting job whose operation time at a work center is shortest. |
A. | material shortage |
B. | shortest-processing-time rule |
C. | (a) and (b) |
D. | none of these |
Answer» C. (a) and (b) | |
54. |
.is the process of testing the feasibility of master production schedules in terms of capacity. |
A. | rough-cut capacity planning |
B. | manpower planning |
C. | financial planning |
D. | all of these |
Answer» B. manpower planning | |
55. |
is an assigning job to work centres without considering the work centre s capacity |
A. | infinite loading |
B. | finite loading |
C. | (a) and (b) |
D. | none of these |
Answer» B. finite loading | |
56. |
is a graphical and algebraic representation of the relationships among volume of output, cost, and revenues. |
A. | break mechanism |
B. | break-even analysis |
C. | fixed analysis |
D. | none of these |
Answer» C. fixed analysis | |
57. |
is the analysis and comparisons of items to group them into families with similar characteristics |
A. | mass technology |
B. | group technology |
C. | independent technology |
D. | none of these |
Answer» C. independent technology | |
58. |
is an information management system that connects all departments and disciplines within a company making them an integrated unit. |
A. | enterprise asset management |
B. | entrepreneurship development |
C. | manpower planning |
D. | none of these |
Answer» B. entrepreneurship development | |
59. |
...is a technology concerned with the application of mechanical, electronic, and computer based systems to operate and control production |
A. | automation |
B. | manpower |
C. | motivation |
D. | supervision |
Answer» B. manpower | |
60. |
is a Computer software programs that allow a designer to carry out geometric transformations rapidly. |
A. | tally |
B. | computer-aided design |
C. | (a) and(b) |
D. | none of these |
Answer» C. (a) and(b) | |
61. |
..is the arrangement of a facility so that equipment used to make similar parts or families of parts is grouped together. |
A. | ) cellular layout |
B. | product lay out |
C. | (a) and (b) |
D. | none of these |
Answer» B. product lay out | |
62. |
Division of labour by skill; assignment of jobs by Skill; basics of time study are contributed by |
A. | adam smith |
B. | eli whitney & others |
C. | charles babbage |
D. | frederick w.taylor |
Answer» D. frederick w.taylor | |
63. |
is concerned with deciding in advance what is to be produced, when to be produced, where to be produced and how to be produced |
A. | operational planning |
B. | operational control. |
C. | (a) and (b). |
D. | none of these |
Answer» B. operational control. | |
64. |
. is the process of verification or correction in the quality of the product when the deviations in the quality are found to be more than expected. |
A. | policies |
B. | quality control |
C. | quantity measurement |
D. | none of these |
Answer» C. quantity measurement | |
65. |
is a measure the actual level of output for a process or activity over a period of time. |
A. | actual capacity |
B. | design capacity |
C. | maximum capacity |
D. | none of these |
Answer» B. design capacity | |
66. |
. involves systematically recording, analysing and synthesizing the times required to perform a motion. |
A. | method study |
B. | motion study |
C. | time study |
D. | all of these |
Answer» D. all of these | |
67. |
Which one of the following is not an objective of maintenance management? |
A. | to reduce breakdown of machineries |
B. | to keep the machines and other facilities in a bad condition. |
C. | to keep the plant in good working condition |
D. | all of these |
Answer» C. to keep the plant in good working condition | |
68. |
can be defined as the measurements that detect the onset of a degradation mechanism, thereby allowing causal stressors to be eliminated or controlled prior to any significant deterioration in the component physical state |
A. | break down maintenance |
B. | predictive maintenance |
C. | past maintenance |
D. | none of these |
Answer» C. past maintenance | |
69. |
.isthe fixation of time and date for each operation as well as it determines the sequence of operations to be followed. |
A. | dispatching |
B. | scheduling. |
C. | routing. |
D. | all of these. |
Answer» C. routing. | |
70. |
.refers to the manufacturing of large volume of a single or a very few varieties of products with a standard set of processes |
A. | continuous production |
B. | intermittent production |
C. | project production |
D. | none of these |
Answer» B. intermittent production | |
71. |
..is concerned with planning the details of the methods required to perform each operation |
A. | factory planning, |
B. | process planning |
C. | operation planning |
D. | none of these |
Answer» D. none of these | |
72. |
. Involves the fixation of path through which work will flow for manufacturing of goods. |
A. | scheduling |
B. | routing |
C. | time study |
D. | none of these |
Answer» C. time study | |
73. |
In . the operations are located and the sequence of these operations in the production is determined |
A. | factory planning, |
B. | process planning |
C. | operation planning |
D. | none of these |
Answer» C. operation planning | |
74. |
is the process of setting of productive activities in motion through release of orders and instructions, in accordance with previously planned timings. |
A. | time study |
B. | follow up |
C. | dispatching |
D. | none of these |
Answer» D. none of these | |
75. |
Which of the following is true? The impact of strategies on the general direction and basic character of a company is |
A. | long range |
B. | short ranged |
C. | minimal |
D. | medium range |
Answer» B. short ranged | |
76. |
.. involves determination of the progress of work, removing bottlenecks in the flow of work and ensuring that the productive operations are taking place in accordance with the plans |
A. | follow up |
B. | time management |
C. | time study |
D. | time booking |
Answer» B. time management | |
77. |
The differences between the actual demand for a period and the demand forecast for that period is called: |
A. | forecast error |
B. | weighted arithmetic mean |
C. | decision process. |
D. | mean square error |
Answer» B. weighted arithmetic mean | |
78. |
. is the process of predicting and defining the long-term and the short-term capacity needs of an organisation and determining how those needs will be satisfied. |
A. | capacity planning |
B. | capacity control |
C. | staff fixation |
D. | instrumentalisation |
Answer» B. capacity control | |
79. |
. is the process of reporting daily progress of work in each shop in a prescribed proforma and to investigate the causes of deviations from the planned performance and to take necessary actions |
A. | follow up |
B. | motion study |
C. | time study |
D. | all of these |
Answer» B. motion study | |
80. |
Production facilities are arranged as per the sequence of production operations from the first operations to the finished product. This method is called .. |
A. | process production |
B. | job production |
C. | both of these |
D. | none of these |
Answer» B. job production | |
81. |
Which of the following is not a key way in which business organizations compete with one another? |
A. | production cost |
B. | product duplication |
C. | flexibility |
D. | quality |
Answer» C. flexibility | |
82. |
is defined as the combination of tasks that are required to keep a machine or part of a machine in the desirable condition. |
A. | substitution |
B. | maintenance |
C. | reduction |
D. | induction |
Answer» C. reduction | |
83. |
. is a time-table of operations specifying the time and date when each operation is to be started and completed. |
A. | time study |
B. | schedule |
C. | loading |
D. | none of these |
Answer» C. loading | |
84. |
.. is that aspect of operation management function, which is concerned with the acquisition, control, and use of materials needed and flow of goods and services connected with the production process. |
A. | materials management |
B. | division of labour |
C. | mass production |
D. | craft production |
Answer» B. division of labour | |
85. |
Scheduling techniques for employees, machines Jobs in manufacturing are associated with |
A. | frank b. gilbreth |
B. | henry l. gantt |
C. | f.w. harris |
D. | elton mayo |
Answer» C. f.w. harris | |
86. |
is the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued |
A. | operational plan |
B. | operational policy |
C. | operational mission |
D. | operational control |
Answer» E. | |
87. |
.is the art and science of ensuring that all which occurs is in accordance with the rules established and the instructions issued in the case of operations. |
A. | operational attack |
B. | operational control |
C. | operational summary |
D. | none of these |
Answer» C. operational summary | |
88. |
The costs of all activities incurred to prevent poor quality in products and services. |
A. | prevention cost |
B. | appraisal cost |
C. | failure cost |
D. | none of the above |
Answer» B. appraisal cost | |
89. |
is the process of selection of path, which each part of the product will follow |
A. | routing. |
B. | scheduling |
C. | follow-up. |
D. | dispatching |
Answer» B. scheduling | |
90. |
is the process of comparing actual performance with the standard and taking corrective Action. |
A. | controlling |
B. | management |
C. | planning |
D. | co-ordination |
Answer» B. management | |
91. |
aims at visualizing and identifying deviation before they actually occur. |
A. | predictive control |
B. | concurrent control |
C. | operational control |
D. | all of these |
Answer» B. concurrent control | |
92. |
Moving of materials from the store room to the machine and from one machine to the next machine during the process of manufacture is called |
A. | ved analysis |
B. | abc analysis |
C. | material handling |
D. | none of these |
Answer» D. none of these | |
93. |
..is the term used to describe the set of statistical tools used by quality professionals for the purpose of quality control |
A. | accounting standards |
B. | statistical quality control |
C. | population study |
D. | none of these |
Answer» C. population study | |
94. |
. is the art of applying tests, preferably by the aid of measuring appliances to observe whether a given item or product is within the specified limits of variability or not. |
A. | inspection |
B. | planning |
C. | leading |
D. | none of these |
Answer» B. planning | |