MCQOPTIONS
Saved Bookmarks
This section includes 20 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
The polished stone value for aggregate of surface course should be more than __________ |
A. | 15 |
B. | 25 |
C. | 35 |
D. | 55 |
Answer» E. | |
2. |
The water sensitivity of aggregates should retain __________ |
A. | 75% of tensile strength |
B. | 80% of tensile strength |
C. | 95% of tensile strength |
D. | 100% of tensile strength |
Answer» C. 95% of tensile strength | |
3. |
The spreading test performed on bitumen can be checked on metal plates of dimensions is? |
A. | 200*200mm |
B. | 300*300mm |
C. | 400*400mm |
D. | 500*500mm |
Answer» B. 300*300mm | |
4. |
The interface bond between the existing pavement and new pavement is provided by __________ |
A. | Tack coat |
B. | Prime coat |
C. | Bitumen |
D. | Oil |
Answer» B. Prime coat | |
5. |
What is the minimum thickness used in bituminous macadam? |
A. | 25 mm |
B. | 50 mm |
C. | 75 mm |
D. | 100 mm |
Answer» D. 100 mm | |
6. |
The camber is checked at every interval of __________ |
A. | 10 m |
B. | 20 m |
C. | 30 m |
D. | 40 m |
Answer» B. 20 m | |
7. |
The stripping of aggregate should be less than __________ |
A. | 12 |
B. | 25 |
C. | 35 |
D. | 45 |
Answer» C. 35 | |
8. |
Built up spray grout consists of __________ |
A. | One layer |
B. | Two layers |
C. | Three layers |
D. | Indefinite layers |
Answer» C. Three layers | |
9. |
How many kg of binder is applied for 10m2 area? |
A. | 68 kg |
B. | 71 kg |
C. | 82 kg |
D. | 93 kg |
Answer» B. 71 kg | |
10. |
The loss with sodium sulphate cycles for aggregate used for bitumen is __________ |
A. | Less than 12% |
B. | Less than 15% |
C. | Less than 16% |
D. | Less than 20% |
Answer» B. Less than 15% | |
11. |
THE_POLISHED_STONE_VALUE_FOR_AGGREGATE_OF_SURFACE_COURSE_SHOULD_BE_MORE_THAN?$ |
A. | 15 |
B. | 25 |
C. | 35 |
D. | 55 |
Answer» E. | |
12. |
THE_WATER_SENSITIVITY_OF_AGGREGATES_SHOULD_RETAIN?$ |
A. | 75% of tensile strength |
B. | 80% of tensile strength |
C. | 95% of tensile strength |
D. | 100% of tensile strength |
Answer» C. 95% of tensile strength | |
13. |
The spreading test performed on bitumen can be checked on metal plates of dimension? |
A. | 200*200mm |
B. | 300*300mm |
C. | 400*400mm |
D. | 500*500mm |
Answer» B. 300*300mm | |
14. |
The interface bond between existing pavement and new pavement is provided by |
A. | Tack coat |
B. | Prime coat |
C. | Bitumen |
D. | Oil |
Answer» B. Prime coat | |
15. |
The minimum thickness used in bituminous macadam is |
A. | 25 mm |
B. | 50 mm |
C. | 75 mm |
D. | 100 mm |
Answer» D. 100 mm | |
16. |
The camber is checked at every interval of |
A. | 10 m |
B. | 20 m |
C. | 30 m |
D. | 40 m |
Answer» B. 20 m | |
17. |
The stripping of aggregate should be less than |
A. | 12 |
B. | 25 |
C. | 35 |
D. | 45 |
Answer» C. 35 | |
18. |
Built up spray grout consists of |
A. | One layer |
B. | Two layers |
C. | Three layers |
D. | Indefinite layers |
Answer» C. Three layers | |
19. |
How many kg of binder is applied for 10m2 area? |
A. | 68 kg |
B. | 71 kg |
C. | 82 kg |
D. | 93 kg |
Answer» B. 71 kg | |
20. |
The loss with sodium sulphate cycles for aggregate used for bitumen is |
A. | Less than 12% |
B. | Less than 15% |
C. | Less than 16% |
D. | Less than 20% |
Answer» B. Less than 15% | |