MCQOPTIONS
Bookmark
Saved Bookmarks
→
Highway Engineering
→
Embankment Subgrade in Highway Engineering
→
The stripping of aggregate should be less than..
1.
The stripping of aggregate should be less than
A.
12
B.
25
C.
35
D.
45
Answer» C. 35
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The polished stone value for aggregate of surface course should be more than __________
The water sensitivity of aggregates should retain __________
The spreading test performed on bitumen can be checked on metal plates of dimensions is?
The interface bond between the existing pavement and new pavement is provided by __________
What is the minimum thickness used in bituminous macadam?
The camber is checked at every interval of __________
The stripping of aggregate should be less than __________
Built up spray grout consists of __________
How many kg of binder is applied for 10m2 area?
The loss with sodium sulphate cycles for aggregate used for bitumen is __________