1.

Highway should be planned for __________

A. Present requirements
B. Traffic developments
C. Traffic studies
D. Present requirements and future requirements
Answer» E.
2.

The planning, design and construction of either a network of new roads or road link is called __________

A. Highway project
B. Highway estimate
C. Highway interlinking
D. Highway design
Answer» B. Highway estimate
3.

The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as __________

A. Feasibility report
B. Detailed project report
C. Survey report
D. Primary report
Answer» C. Survey report
4.

The approximate cost of construction evaluated for the project is called __________

A. Project report
B. Project feasibility
C. Estimate
D. Detailed project report
Answer» D. Detailed project report
5.

The cross sections should be drawn for every __________

A. 10m
B. 20m
C. 50m
D. 100m
Answer» E.
6.

The index map shows __________

A. Topography
B. Soil
C. Area of the site
D. Plan
Answer» B. Soil
7.

The New highway project is divided into how many stages?

A. One
B. Two
C. Three
D. Four
Answer» E.
8.

Highway should be planned for

A. Present requirements
B. Traffic developments
C. Traffic studies
D. Present requirements and future requirements
Answer» B. Traffic developments
9.

The planning, design and construction of either a network of new roads or road link is called

A. Highway project
B. Highway estimate
C. Highway interlinking
D. Highway design
Answer» E.
10.

The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as

A. Feasibility report
B. Detailed project report
C. Survey report
D. Primary report
Answer» D. Primary report
11.

The approximate cost of construction evaluated for the project is called

A. Project report
B. Project feasibility
C. Estimate
D. Detailed project report
Answer» E.
12.

The cross sections should be drawn for every

A. 10m
B. 20m
C. 50m
D. 100m
Answer» C. 50m
13.

Detailed size drawings are prepared in which sheet?

A. A1
B. A2
C. A3
D. A4
Answer» B. A2