The camber is checked at every interval of..
1.
The camber is checked at every interval of
A.
10 m
B.
20 m
C.
30 m
D.
40 m
Answer» B. 20 m
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The polished stone value for aggregate of surface course should be more than __________
The water sensitivity of aggregates should retain __________
The spreading test performed on bitumen can be checked on metal plates of dimensions is?
The interface bond between the existing pavement and new pavement is provided by __________
What is the minimum thickness used in bituminous macadam?
The camber is checked at every interval of __________
The stripping of aggregate should be less than __________
Built up spray grout consists of __________
How many kg of binder is applied for 10m2 area?
The loss with sodium sulphate cycles for aggregate used for bitumen is __________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply