 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 17 Mcqs, each offering curated multiple-choice questions to sharpen your Vlsi knowledge and support exam preparation. Choose a topic below to get started.
| 1. | Which method is more complex? | 
| A. | stuck at fault | 
| B. | CA | 
| C. | combinational ATPG | 
| D. | sequential ATPG | 
| Answer» E. | |
| 2. | The sum of all propagation delays along a single path is given as | 
| A. | gate delay fault | 
| B. | transition fault | 
| C. | path delay fault | 
| D. | propagation fault | 
| Answer» D. propagation fault | |
| 3. | The _________ between two signal is called as bridging fault. | 
| A. | open circuit | 
| B. | break | 
| C. | connection | 
| D. | short circuit | 
| Answer» E. | |
| 4. | Stuck-at fault is an example of ______ fault model. | 
| A. | transient | 
| B. | permanent | 
| C. | intermittent | 
| D. | simple | 
| Answer» C. intermittent | |
| 5. | The stuck-at model is a _____ fault model. | 
| A. | recurring | 
| B. | equivalent | 
| C. | simple | 
| D. | logical | 
| Answer» E. | |
| 6. | ‘n’ signal lines can potentially have _____ stuck-at faults. | 
| A. | n2 | 
| B. | 2n | 
| C. | n | 
| D. | n/2 | 
| Answer» C. n | |
| 7. | The automatic test pattern generator method has ________ phases. | 
| A. | two | 
| B. | three | 
| C. | four | 
| D. | five | 
| Answer» B. three | |
| 8. | Which method is more complex?$ | 
| A. | stuck at fault | 
| B. | CA | 
| C. | combinational ATPG | 
| D. | sequential ATPG | 
| Answer» E. | |
| 9. | The _____ between two signal is called as bridging faul? | 
| A. | open circuit | 
| B. | break | 
| C. | connection | 
| D. | short circuit | 
| Answer» E. | |
| 10. | Transient faults does not depend on operating condition. | 
| A. | true | 
| B. | false | 
| Answer» C. | |
| 11. | Stuck-at fault is an example of ______ fault model | 
| A. | transient | 
| B. | permanent | 
| C. | intermittent | 
| D. | simple | 
| Answer» C. intermittent | |
| 12. | The stuck-at model is a _____ fault model | 
| A. | recurring | 
| B. | equivalent | 
| C. | simple | 
| D. | logical | 
| Answer» E. | |
| 13. | ‘n’ signal lines can potentially have _____ stuck-at faults$ | 
| A. | n<sup>2</sup> | 
| B. | 2n | 
| C. | n | 
| D. | n/2 | 
| Answer» C. n | |
| 14. | The process of removing equivalent faults is called as | 
| A. | equivalent removing | 
| B. | bulk damaging | 
| C. | fault collapsing | 
| D. | fault reduction | 
| Answer» D. fault reduction | |
| 15. | Faults which produce same faulty behaviour are known as | 
| A. | similar faults | 
| B. | equivalent faults | 
| C. | correlative faults | 
| D. | ambigious faults | 
| Answer» C. correlative faults | |
| 16. | The automatic test pattern generator method has ____ phases | 
| A. | two | 
| B. | three | 
| C. | four | 
| D. | five | 
| Answer» B. three | |
| 17. | Automatic test pattern generator detects only the fault and not its cause. | 
| A. | true | 
| B. | false | 
| Answer» C. | |