| 1. |
Which method is more complex? |
| A. | stuck at fault |
| B. | CA |
| C. | combinational ATPG |
| D. | sequential ATPG |
| Answer» E. | |
| 2. |
The sum of all propagation delays along a single path is given as |
| A. | gate delay fault |
| B. | transition fault |
| C. | path delay fault |
| D. | propagation fault |
| Answer» D. propagation fault | |
| 3. |
The _________ between two signal is called as bridging fault. |
| A. | open circuit |
| B. | break |
| C. | connection |
| D. | short circuit |
| Answer» E. | |
| 4. |
Stuck-at fault is an example of ______ fault model. |
| A. | transient |
| B. | permanent |
| C. | intermittent |
| D. | simple |
| Answer» C. intermittent | |
| 5. |
The stuck-at model is a _____ fault model. |
| A. | recurring |
| B. | equivalent |
| C. | simple |
| D. | logical |
| Answer» E. | |
| 6. |
‘n’ signal lines can potentially have _____ stuck-at faults. |
| A. | n2 |
| B. | 2n |
| C. | n |
| D. | n/2 |
| Answer» C. n | |
| 7. |
The automatic test pattern generator method has ________ phases. |
| A. | two |
| B. | three |
| C. | four |
| D. | five |
| Answer» B. three | |
| 8. |
Which method is more complex?$ |
| A. | stuck at fault |
| B. | CA |
| C. | combinational ATPG |
| D. | sequential ATPG |
| Answer» E. | |
| 9. |
The _____ between two signal is called as bridging faul? |
| A. | open circuit |
| B. | break |
| C. | connection |
| D. | short circuit |
| Answer» E. | |
| 10. |
Transient faults does not depend on operating condition. |
| A. | true |
| B. | false |
| Answer» C. | |
| 11. |
Stuck-at fault is an example of ______ fault model |
| A. | transient |
| B. | permanent |
| C. | intermittent |
| D. | simple |
| Answer» C. intermittent | |
| 12. |
The stuck-at model is a _____ fault model |
| A. | recurring |
| B. | equivalent |
| C. | simple |
| D. | logical |
| Answer» E. | |
| 13. |
‘n’ signal lines can potentially have _____ stuck-at faults$ |
| A. | n<sup>2</sup> |
| B. | 2n |
| C. | n |
| D. | n/2 |
| Answer» C. n | |
| 14. |
The process of removing equivalent faults is called as |
| A. | equivalent removing |
| B. | bulk damaging |
| C. | fault collapsing |
| D. | fault reduction |
| Answer» D. fault reduction | |
| 15. |
Faults which produce same faulty behaviour are known as |
| A. | similar faults |
| B. | equivalent faults |
| C. | correlative faults |
| D. | ambigious faults |
| Answer» C. correlative faults | |
| 16. |
The automatic test pattern generator method has ____ phases |
| A. | two |
| B. | three |
| C. | four |
| D. | five |
| Answer» B. three | |
| 17. |
Automatic test pattern generator detects only the fault and not its cause. |
| A. | true |
| B. | false |
| Answer» C. | |