During load shedding |
| A. | ystem power factor is changed |
| B. | ome loads are switched off |
| C. | ystem voltage is reduced |
| D. | ystem frequency is reduced Efficiency is the secondary consideration in |
| Answer» C. ystem voltage is reduced | |