1. |
During load shedding |
A. | ystem power factor is changed |
B. | ome loads are switched off |
C. | ystem voltage is reduced |
D. | ystem frequency is reduced Efficiency is the secondary consideration in |
Answer» C. ystem voltage is reduced | |