Explore topic-wise MCQs in Electronics & Communication Engineering.

This section includes 495 Mcqs, each offering curated multiple-choice questions to sharpen your Electronics & Communication Engineering knowledge and support exam preparation. Choose a topic below to get started.

301.

Factory A produces 100 pieces of wooden legs used in manufacturing tables in 1 hour. The factory in total works for 3 hours. The quality manager decided to check the quality of the outputby measuring the length of the legs (in cms). He decides to collect three samples (one for each hour). The sample size for each sample is fixed at 5. The data collected is present in the following table: What is the mean and range of leg length in sample 1?

A. Mean=10.3;Range=.3
B. Mean=10.1;Range=.8
C. Mean=10.2;Range=.6
D. Mean=9.9;Range=.5
Answer» C. Mean=10.2;Range=.6
302.

Given that for the three samples, the value of R bar is .66 and value of d2 corresponding tothree is1.128, what is the estimated standard deviation?

A. .43
B. .67
C. .58
D. .75
Answer» D. .75
303.

During experimental design, a variable is defined as:

A. Treatment
B. Factor
C. Variance
D. None of these
Answer» C. Variance
304.

Inspection is part of the ______________

A. quality control (not sure)
B. Quality Planning
C. Quality improvement
D. Quality circle
Answer» B. Quality Planning
305.

What is the Variation due to Interaction?

A. 84%
B. 76%
C. 19%
D. 5%
Answer» E.
306.

Quality in a project's product is essential for the enhancement of the project manager and the selling organization. To ensure that the customer perceives a quality product, the project manager must inform the ustomer of the ______________ to be used so the customer will not have a perception of ______________.

A. materials; inferior fabrication
B. standards; gold plating
C. practices; poor workmanship
D. pricing; gouging
Answer» C. practices; poor workmanship
307.

Juran's quality management philosophy is based on three pillars namely planning, control and______________.

A. Implementation
B. Improvement
C. Monitor
D. Design
Answer» C. Monitor
308.

A ______________ effect(s) analysis examines mean differences at each level of theindependent variable.

A. main
B. simple main
C. interaction
D. simple interaction
Answer» C. interaction
309.

Given L=3 and p=.03, estimate the sample size that can be used for construction of a pchart.

A. 534
B. 321
C. 123
D. 291 ((1-p)∗L2/p gives us an estimate of sample size)
Answer» E.
310.

Attribute charts may be used when:

A. Several characteristics can be jointly measured
B. When one particular quality characteristic is of importance
C. Specific information like process mean is required
D. None of these
Answer» B. When one particular quality characteristic is of importance
311.

DMAIC is ______________

A. develop, multiply, analyze, improve, check
B. define, muliply, analyze, improve, control
C. define, measure, analyze, improve, control
D. define, manufacture, analyze, improve, control
Answer» D. define, manufacture, analyze, improve, control
312.

Failure Mode and Effects Analysis, which prioritizes different sources of error, is used in______________ stage.

A. Define
B. Measure
C. Improve
D. Analyze
Answer» E.
313.

Process capability ratio is expressed as:

A. USL+LSL/6σ
B. USL-LSL/6σ
C. USL-LSL/3σ
D. USL-LSL/σ
Answer» C. USL-LSL/3σ
314.

For question 09 - 15, consider the model with the two factors, each at two levels:

A. 40
B. 20
C. 10
D. 5
Answer» B. 20
315.

What is the value at the position of (III)?

A. 0.04
B. 0.85
C. 0.15
D. 0.033
Answer» C. 0.15
316.

The job characteristic of quality professionals is:

A. Educating others
B. Achieving personal targets
C. Consultative work with other departments
D. None of the above
Answer» E.
317.

The customer requirement to be reviewedi. Before supply of product ii. After supply of product iii. Before commitment of supply of product The correct order is

A. i & ii
B. i & iii
C. ii & iii
D. None of the above
Answer» C. ii & iii
318.

For the above table, what is the value corresponding to the central line for the x bar chart?

A. 10.08
B. 10.05
C. 9.89
D. 9.78
Answer» B. 10.05
319.

Dr. AB is designing a 3 x 7 factorial experiment. Which of the following is true about AB's study?

A. Dr. AB has 21 subjects.
B. Dr. AB's study has 2 independent variables: one with 3 levels and one with 7 levels
C. Dr. AB's study has 21 independent variables.
D. Dr. AB's study has 3 independent variables: one with 3 levels, one with 7 levels, and one with 21 levels.
Answer» C. Dr. AB's study has 21 independent variables.
320.

When conducting a one-way ANOVA, the ______________ the between-treatmentvariability is when compared to the within-treatment variability, the ______________ the FValue calculated from the data will tend to be.

A. smaller, larger
B. smaller, smaller
C. larger, larger
D. smaller, larger
Answer» C. larger, larger
321.

Benefit(s) of model based improvement is (are)i. Establish common language ii. Models are comprehensive The correct order is

A. i only
B. ii only
C. i & ii
D. None of the above
Answer» D. None of the above
322.

The average run length can be defined as:

A. The beta risk for an x bar chart
B. The expected number of samples taken before any shift in process quality is detected
C. The number of samples used in the construction of x bar chart
D. The number of items per sample
Answer» C. The number of samples used in the construction of x bar chart
323.

Control chart is i. Process monitoring tool ii. Process control tool iii. Process planning tool The correct order is

A. i only
B. i & ii
C. i, ii & iii
D. None of the above
Answer» C. i, ii & iii
324.

The probability of getting a multiple of 2 on throwing a dice once is:

A. 1/6
B. ¼
C. ½
D. 1/3
Answer» B. ¼
325.

Does TQM approach have relevance to Indian industry in context to i. Customer satisfaction ii. People involvement iii. Policy managementThe correct order is

A. i only
B. i & ii
C. ii & iii
D. i, ii & iii
Answer» C. ii & iii
326.

Student's t-test is applicable only when:

A. n ≤ 30 and σ is known
B. n > 30 and σ is unknown
C. n = 30 and σ is known
D. All of these
Answer» B. n > 30 and σ is unknown
327.

______________ are the areas that will be covered by the organization's processes

A. process areas
B. product Areas
C. private areas
D. preset areas
Answer» B. product Areas
328.

X bar charts are uses to control the ______________ of a process.

A. Dispersion
B. Central tendency
C. None of the above
D. Both a and b
Answer» C. None of the above
329.

When data is plotted on the control charts, the data is of two types: R and -bar. The R data represent points of a ______________ while the X-bar data represent points of a (n) ______________.

A. random sample; cross-matrix sample
B. real sample; simulated sample
C. 100 percent sampling; 10 percent sampling
D. sampling run; average of several runs
Answer» E.
330.

In a study, subjects are randomly assigned to one of three groups: control, experimental A, or experimental B. After treatment, the mean scores for the three groups are compared. The appropriate statistical test for comparing these means is:

A. the correlation coefficient
B. chi square
C. the t-test
D. the analysis of variance
Answer» E.
331.

A fishbone diagram is also known as a .______________

A. cause-and-effect diagram
B. poka-yoke diagram
C. Kaizen diagram
D. Taguchi diagram
Answer» B. poka-yoke diagram
332.

The overall intentions and direction of an organization with regard to quality asformally expressed by top management is a:

A. Quality Plan
B. Quality Statement
C. Quality Policy
D. TQM
Answer» D. TQM
333.

The mean square is the sum of squares divided by

A. the total number of observations
B. its corresponding degrees of freedom - 1
C. its corresponding degrees of freedom
D. none of these
Answer» D. none of these
334.

Special characteristic means i. Product characteristic which affect fit/ function / Regulation ii. Characteristic of product which are regulatory requirement iii. Characteristic in Specification The correct order is

A. i only
B. i & ii
C. ii & iii
D. i, ii & iii
Answer» C. ii & iii
335.

Which of the following is false regarding when acceptance sampling is useful:

A. When testing is destructive
B. When 100% inspection cost is very low
C. When there are potentially serious product liability risk
D. When 100% inspection is not technically feasible
Answer» C. When there are potentially serious product liability risk
336.

Common elements of winners arei. Senior management was actively involved ii. Control of overall process iii. Focus on customer The correct order is

A. i only
B. i & ii
C. i, ii & iii
D. None of the above
Answer» D. None of the above
337.

The Toyota Production System is based on two pillars namely ______________ and______________.

A. Kaizen, Six Sigma
B. Lean, Six Sigma
C. Just in Time, Jidoka
D. Just in Time, Kaizen
Answer» D. Just in Time, Kaizen
338.

Elements of quality management system are ______________

A. organizational structure
B. responsibilities
C. procedures
D. all the three (not sure)
Answer» E.
339.

______________ is the set of activities that ensures the quality levels of products andservices are properly maintained and that supplier and customer quality issues are properly resolved.

A. Quality Assurance
B. Quality Planning
C. Quality Control
D. Quality Management
Answer» B. Quality Planning
340.

An acceptance control chart has limits that are based on the specification limits for the product rather than limits which differentiate between random and assignable causes. Under which if the following circumstance should a QC manager consider using an acceptance control chart?

A. When the engineering tolerance on a dimension greatly exceeds the natural dispersion of the manufacturing process
B. When the number of samples outside the current control chart limits become too costly and cumbersome to investigate
C. When a process is subject to constant but stable tool wear
D. A and C
Answer» E.
341.

The defect concentration diagram can be used in the ______________ stage of the DMAIC.

A. Define
B. Measure
C. Analyze
D. Improve
Answer» D. Improve
342.

The focal point of all quality control should be:

A. Price focus
B. Cost Focus
C. Customer Focus
D. Manufacturing Focus
Answer» D. Manufacturing Focus
343.

The ______________ is used to identify what might go wrong in a plan under development.

A. Pareto Chart
B. PDPC
C. Arrow Diagram
D. Matrix Diagram
Answer» C. Arrow Diagram
344.

All of the following are the elements of a TQM system EXCEPT:

A. Leadership
B. Communications
C. Measurement
D. Detentions
Answer» E.
345.

Lot tolerance percent defective (LTPD) is a level of lot quality specified by the______________.

A. Consumer
B. Producer
C. Supplier
D. Sampling Plan
Answer» B. Producer
346.

For an ideal OC curve the probability of acceptance for lot fraction defective less than .01 is______________.

A. Equal to 1
B. Less than 1
C. Greater than 1
Answer» B. Less than 1
347.

Q-Q plot is used to check:/p>

A. Normality of the dataset
B. Number of defects
C. Process mean
D. Process standard deviation
Answer» B. Number of defects
348.

Cost of quality includes:

A. Cost of all work to build a product or service that conforms to the requirements
B. Training programs
C. Cost of all work resulting from nonconformance to the requirements
D. all of the above
Answer» E.
349.

The chart used for tracking number non-conforming is:

A. P
B. Np
C. X bar
D. None of the above
Answer» C. X bar
350.

Statistical sampling methods are valid for most projects, regardless of the lack ofrepetitive processes, because ______________.

A. projects rely on external vendors for products that must meet contractual specifications to conform to the requirements
B. purchased materials will never meet the requirements of the project
C. services are amenable to statistical sampling even for small lots
D. it looks good to the customer when there is a mathematical approach to quality
Answer» B. purchased materials will never meet the requirements of the project