1. |
PERT is applied for |
A. | marketing programmes and advertising programmes |
B. | installation of machinery |
C. | research and development of products |
D. | all of these |
Answer» E. | |
2. |
The most important function of inventory control is |
A. | stock control system |
B. | to run the stores effectively |
C. | technical responsibility for the state of materials |
D. | all of the above |
Answer» E. | |
3. |
In product layout |
A. | specialised and strict supervision is required |
B. | machines can not be used to their maximum capacity |
C. | manufacturing cost rises with a fall in the volume of production |
D. | all of the above |
Answer» E. | |
4. |
A critical activity has |
A. | maximum slack |
B. | minimum slack |
C. | zero slack |
D. | average slack |
Answer» D. average slack | |
5. |
In a functional organisation |
A. | quality of work is better |
B. | wastage of material is minimum |
C. | specialised knowledge and guidance to individual worker is provided |
D. | all of the above |
Answer» E. | |
6. |
The product layout |
A. | lowers overall manufacturing time |
B. | requires less space for placing machines |
C. | utilises machine and labour better |
D. | all of these |
Answer» E. | |
7. |
Time study is carried out |
A. | by finding all the significant informations regarding the job, work place and machine tool etc. |
B. | by breaking up each operation into small elements which are measurable with the help of the measuring device accurately |
C. | by observing and recording the time taken by the operator for an operation |
D. | all of the above |
Answer» E. | |
8. |
Acceptance sampling is used in |
A. | job production |
B. | batch production |
C. | mass production |
D. | all of these |
Answer» D. all of these | |
9. |
The average time recorded by work study man for an operation is called |
A. | standard time |
B. | normal time |
C. | representative time |
D. | none of these |
Answer» D. none of these | |
10. |
In value engineering, important consideration is given to |
A. | customer satisfaction |
B. | function concept |
C. | profit maximisation |
D. | cost reduction |
Answer» E. | |
11. |
Valve analysis is particularly of interest when |
A. | jobbing work economics are involved |
B. | production is on large scale |
C. | only few components are involved |
D. | costly equipment is used |
Answer» C. only few components are involved | |
12. |
The type of layout used for manufacturing steam turbines, is |
A. | product layout |
B. | process layout |
C. | fixed position layout |
D. | any one of these |
Answer» D. any one of these | |
13. |
For material transportation, conveyors are used when the prevailing conditions include |
A. | loads are uniform |
B. | routes do not vary |
C. | materials move relatively continuously |
D. | all of these |
Answer» E. | |
14. |
Merit rating is the method of determining the |
A. | relative values of a job |
B. | worker's performance on a job |
C. | worth of a machine |
D. | value of overall production |
Answer» C. worth of a machine | |
15. |
In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker |
A. | whose output exceeds 67% efficiency |
B. | on the percentage of time saved |
C. | on the percentage of time worked |
D. | on the percentage of standard time |
Answer» B. on the percentage of time saved | |
16. |
M.T.M. is used to |
A. | improve existing methods |
B. | establish time standards |
C. | develop effective methods in advance of the beginning of production |
D. | all of the above |
Answer» E. | |
17. |
Gantt chart gives information about |
A. | scheduling and routing |
B. | sales |
C. | production schedule |
D. | machine utilisation |
Answer» D. machine utilisation | |
18. |
If () is the base rate guaranteed per hour, () is the standard time for the job and () is the actual time, then according to Rowan plan, wages for the job will be |
A. | + ( |
B. | - |
C. | ) |
Answer» E. | |
19. |
Dummy activities are used to |
A. | determine the critical path |
B. | determine the project completion time |
C. | maintain the required net work |
D. | none of these |
Answer» D. none of these | |
20. |
In a thermal power plant, coal from the coal handling plant is moved to the boiler bunker through a |
A. | belt conveyor |
B. | bucket conveyor |
C. | fork lift truck |
D. | overhead crane |
Answer» B. bucket conveyor | |
21. |
A PERT network has three activities on critical path with mean time 3, 8 and 6 and standard deviations 1, 2 and 2 respectively. The probability that the project will be completed in 20 days is |
A. | 0.50 |
B. | 0.66 |
C. | 0.84 |
D. | 0.95 |
Answer» D. 0.95 | |
22. |
Scheduling |
A. | prescribes the sequence of operations to be followed |
B. | determines the programme for the operations |
C. | is concerned with starting of processes |
D. | regulates the progress of job through various processes |
Answer» C. is concerned with starting of processes | |
23. |
F. W. Taylor introduced a system of organisation known as |
A. | line organisation |
B. | functional organisation |
C. | line and staff organisation |
D. | line, staff and functional organisation |
Answer» C. line and staff organisation | |
24. |
The correct sequence of phases in value engineering is |
A. | creative phase, information phase, investigation phase, evaluation phase |
B. | information phase, creative phase, investigation phase, evaluation phase |
C. | investigation phase, information phase, creative phase, evaluation phase |
D. | creative phase, investigation phase, evaluation phase, information phase |
Answer» B. information phase, creative phase, investigation phase, evaluation phase | |
25. |
When slack of an activity is positive |
A. | it represents a situation where extra resources are available and the completion of project is not delayed |
B. | it represents that a programme falls behind schedule and additional resources are required to complete the project in time |
C. | the activity is critical and any delay in its performance will delay the completion of whole project |
D. | any one of the above |
Answer» B. it represents that a programme falls behind schedule and additional resources are required to complete the project in time | |
26. |
Time study is used to |
A. | determine standard costs |
B. | determine the number of machines a person may run |
C. | provide a basis for setting piece price or incentive wages |
D. | all of the above |
Answer» E. | |
27. |
The factors which are to be considered while developing a good wage incentive plan will include |
A. | adequate incentive |
B. | ease of administration |
C. | guaranteed basic pay |
D. | all of these |
Answer» E. | |
28. |
Work study is mainly aimed at |
A. | determining the most efficient method of performing a job |
B. | establishing the minimum time of completion of a job |
C. | developing the standard method and standard time of a job |
D. | economising the motions involved on the part of the worker while performing a job |
Answer» B. establishing the minimum time of completion of a job | |
29. |
The type of organisation preferred for an automobile industry, is |
A. | line organisation |
B. | functional organisation |
C. | line and staff organisation |
D. | line, staff and functional organisation |
Answer» D. line, staff and functional organisation | |
30. |
Which of the following statement is correct about the network diagram? |
A. | The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows. |
B. | The tail end of the arrow represents the start of an activity. |
C. | The head of the arrow represents the end of an activity. |
D. | all of the above |
Answer» E. | |
31. |
According to Rowan plan of wage incentive system, bonus is paid to a worker |
A. | whose output exceeds 67% efficiency |
B. | on the percentage of time saved |
C. | on the percentage of time worked |
D. | on the percentage of standard time |
Answer» D. on the percentage of standard time | |
32. |
Which of the following charts are used for plant layout design? |
A. | Operation process chart |
B. | Man machine chart |
C. | Travel chart |
D. | all of these |
Answer» E. | |
33. |
Earliest finish time can be regarded as |
A. | earliest start time + duration of activity |
B. | earliest start time - duration of activity |
C. | latest finish time + duration of activity |
D. | latest finish time - duration of activity |
Answer» B. earliest start time - duration of activity | |
34. |
If () is the base rate guaranteed per hour, () is the standard time for the job and () is the actual time, then according to Halsey 50-50 plan, wages for the job will be |
A. | + ( |
B. | - |
C. | ) |
Answer» C. ) | |
35. |
A-B-C analysis |
A. | is a basic technique of materials management |
B. | is meant for relative inventory control |
C. | does not depend upon the unit cost of the item but on its annual consumption |
D. | all of the above |
Answer» E. | |
36. |
The process capability of a machine is defined as the capability of the machine to |
A. | produce a definite volume of work per minute |
B. | perform definite number of operations |
C. | produce job at a definite spectrum of speed |
D. | hold a definite spectrum of tolerance and surface finish |
Answer» B. perform definite number of operations | |
37. |
Service time in queuing theory is usually assumed to follow |
A. | normal distribution |
B. | Poissons distribution |
C. | Erlang distribution |
D. | exponential law |
Answer» E. | |
38. |
According to Muther, the basic principle of best layout is |
A. | principle of over-all integration |
B. | principle of flow |
C. | principle of flexibility |
D. | all of these |
Answer» E. | |
39. |
A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the |
A. | fixed cost line |
B. | variable cost line |
C. | total cost line |
D. | sales revenue line |
Answer» C. total cost line | |
40. |
Which of the following conditions are necessary for applying linear programming? |
A. | These must be a well defined objective function. |
B. | The decision variables should be interrelated and non-negative. |
C. | The resources must be in limited supply. |
D. | all of the above |
Answer» E. | |
41. |
Indirect expenses include |
A. | factory expenses |
B. | selling expenses |
C. | administrative expenses |
D. | all of these |
Answer» E. | |
42. |
The start or completion of task is called |
A. | an event |
B. | an activity |
C. | a duration |
D. | none of these |
Answer» B. an activity | |
43. |
The main objective of work measurement is to |
A. | plan and schedule of production |
B. | formulate a proper incentive scheme |
C. | estimate the selling prices and delivery dates |
D. | all of the above |
Answer» E. | |
44. |
In perpetual inventory control, the material is checked as it reaches its |
A. | maximum value |
B. | minimum value |
C. | average value |
D. | any one of these |
Answer» E. | |
45. |
In process layout |
A. | handling and back-tracking of materials is too much |
B. | production control is more difficult and costly |
C. | routing and scheduling is more difficult |
D. | all of the above |
Answer» E. | |
46. |
A feasible solution to the linear programming problem should |
A. | satisfy the problem constraints |
B. | optimise the objective function |
C. | satisfy the problem constraints and non-negativity restrictions |
D. | satisfy the non-negativity restrictions |
Answer» D. satisfy the non-negativity restrictions | |
47. |
Routing |
A. | prescribes the sequence of operations to be followed |
B. | determines the programme for the operations |
C. | is concerned with starting of processes |
D. | regulates the progress of job through various processes |
Answer» B. determines the programme for the operations | |
48. |
Product layout is also known as |
A. | analytical layout |
B. | synthetic layout |
C. | static product layout |
D. | none of these |
Answer» C. static product layout | |
49. |
The work study is done by means of |
A. | planning chart |
B. | process chart |
C. | stop watch |
D. | any one of these |
Answer» D. any one of these | |
50. |
P.M.T.S. (Predetermined Motion Time Systems) include |
A. | M.T.M. (Method Time Measurement) |
B. | W.F.S. (Work Factor Systems) |
C. | B.M.T.S. (Basic Motion Time Study) |
D. | all of these |
Answer» E. | |