MCQOPTIONS
Saved Bookmarks
This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
The drawing for re alignment shows the existing road, proposed re alignment, contours and all other features it is called as ___________ |
A. | Plan |
B. | Elevation |
C. | Cross section |
D. | Longitudinal section |
Answer» B. Elevation | |
2. |
Embankments are provided on a highway near ___________ |
A. | Important cities |
B. | Religious structure |
C. | Railway tracks and highly flooded area |
D. | Costly structures |
Answer» D. Costly structures | |
3. |
The highly flooded areas should be re aligned by ___________ |
A. | Providing additional thickness of the pavement |
B. | Providing suitable layers of pavement |
C. | Providing appropriate camber |
D. | Providing higher geometric specifications |
Answer» B. Providing suitable layers of pavement | |
4. |
To minimize the cost of the project the most suitable method is ___________ |
A. | CPM |
B. | PERT |
C. | CPM and PERT |
D. | Normal distribution curves |
Answer» B. PERT | |
5. |
Road roughness is tested by ___________ |
A. | Bump integrator |
B. | RTRRMS |
C. | GIS |
D. | UI |
Answer» B. RTRRMS | |
6. |
Inspection of the site is done in which survey? |
A. | Preliminary |
B. | Secondary |
C. | Reconnaissance |
D. | Final report |
Answer» D. Final report | |
7. |
A part of land that is acquired during the initial stages of construction for future expansion is called ____________ |
A. | Kerb |
B. | Footpath |
C. | Right of way |
D. | Camber |
Answer» D. Camber | |
8. |
The drawing for re alignment shows the existing road, proposed re alignment, contours and all other features it is called a? |
A. | Plan |
B. | Elevation |
C. | Cross section |
D. | Longitudinal section |
Answer» B. Elevation | |
9. |
Embankments are provided on highway near |
A. | Important cities |
B. | Religious structure |
C. | Railway tracks and highly flooded area |
D. | Costly structures |
Answer» D. Costly structures | |
10. |
The highly flooded areas should be re aligned by |
A. | Providing additional thickness of pavement |
B. | Providing suitable layers of pavement |
C. | Providing appropriate camber |
D. | Providing higher geometric specifications |
Answer» B. Providing suitable layers of pavement | |
11. |
To minimize the cost of the project the most suitable method is |
A. | CPM |
B. | PERT |
C. | CPM and PERT |
D. | Normal distribution curves |
Answer» B. PERT | |
12. |
Road roughness is tested by |
A. | Bump integrator |
B. | RTRRMS |
C. | GIS |
D. | UI |
Answer» B. RTRRMS | |
13. |
Inspection of site is done in which survey? |
A. | Preliminary |
B. | Secondary |
C. | Reconnaissance |
D. | Final report |
Answer» D. Final report | |
14. |
Which method is recommended by IRC for flexible pavements? |
A. | CBR |
B. | IRC 6 |
C. | IRC 21 |
D. | IRC 58 |
Answer» B. IRC 6 | |
15. |
A part of land that is acquired during initial stages of construction for future expansion is called |
A. | Kerb |
B. | Footpath |
C. | Right of way |
D. | Camber |
Answer» D. Camber | |