

MCQOPTIONS
Saved Bookmarks
1. |
To minimize the cost of the project the most suitable method is ___________ |
A. | CPM |
B. | PERT |
C. | CPM and PERT |
D. | Normal distribution curves |
Answer» B. PERT | |