Explore topic-wise MCQs in Civil Engineering.

This section includes 94 Mcqs, each offering curated multiple-choice questions to sharpen your Civil Engineering knowledge and support exam preparation. Choose a topic below to get started.

1.

While estimating a reinforced cement structure, the omitted cover of concrete is assumed%!

A. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
B. In thin slabs, 12 mm minimum or diameter of the bar whichever is more
C. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
D. All the above
Answer» E.
2.

The measurement is not made in square meters in case of%!

A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja
Answer» E.
3.

The expected out turn of half brick partition wall per mason per day is%!

A. 1.5 m³
B. 2.0 m³
C. 4.0 m³
D. 5.0 m³
Answer» C. 4.0 m¬¨‚â•
4.

The cross-sections for a highway is taken at%!

A. Right angle to the centre line
B. 30 meters apart
C. Intermediate points having abrupt change in gradient
D. All the above
Answer» E.
5.

The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is%!

A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these
Answer» C. (6 + 18) chains
6.

The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is%!

A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Answer» D. Rs. 500
7.

The detention period in a septic tank is assumed%!

A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes
Answer» D. 40 minutes
8.

While preparing a detailed estimate%!

A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to 0.01 cum
D. All the above
Answer» E.
9.

Anti-siphonage pipe is connected to%!

A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
Answer» D. Side of water closet
10.

*$_The reduced levels of points, 30 metres apart along the longitudinal section of a road portion between chainages 5 and 9 are shown in the given figure. If there is a uniform up-gradient of the road 120 in 1, the chainage of the point with no filling or cutting is?

A. (6 + 15) chains
B. (6 + 12) chains
C. (6 + 18) chains
D. None of these
Answer» C. (6 + 18) chains
11.

*$_While preparing a detailed estimate?

A. Dimension should be measured correct to 0.01 m
B. Area should be measured correct to 0.01 sqm
C. Volume should be measured correct to 0.01 cum
D. All the above
Answer» E.
12.

*$_The detention period in a septic tank is assumed?

A. 20 minutes
B. 25 minutes
C. 30 minutes
D. 40 minutes
Answer» D. 40 minutes
13.

*$_The cross-sections for a highway is taken at?

A. Right angle to the centre line
B. 30 meters apart
C. Intermediate points having abrupt change in gradient
D. All the above
Answer» E.
14.

*$_Anti-siphonage pipe is connected to?

A. Main soil pipe
B. Bottom of P trap W.C.
C. Top of P trap W.C.
D. Side of water closet
Answer» D. Side of water closet
15.

*$_The cost of the earthwork in excavation for the surface drain of cross-section shown in the given figure for a total length of 5 metres @ Rs. 450% cum, is?

A. Rs. 400
B. Rs. 425
C. Rs. 450
D. Rs. 500
Answer» D. Rs. 500
16.

*$_The expected out turn of half brick partition wall per mason per day is?

A. 1.5 m³
B. 2.0 m³
C. 4.0 m³
D. 5.0 m³
Answer» C. 4.0 m¬¨‚â•
17.

*$_While estimating a reinforced cement structure, the omitted cover of concrete is assumed?

A. At the end of reinforcing bar, not less than 25 mm or twice the diameter of the bar
B. In thin slabs, 12 mm minimum or diameter of the bar whichever is more
C. For reinforcing longitudinal bar in a beam 25 mm minimum or diameter of the largest bar which is more
D. All the above
Answer» E.
18.

*$_If B is the width of formation, d is the height of the embankment, side slope S : 1, for a highway with no transverse slope, the area of cross-section is?

A. B + d + Sd
B. Bd + Sd2
C. B √ó d - Sd1/2
D. ¬Ω (Bd + Sd2)
Answer» C. B ‚àö√≥ d - Sd1/2
19.

*$_The unit of measurement is per quintal for the following:?

A. Collapsible gates with rails
B. Rolling shutters
C. Expanded metal wire netting
D. M.S. reinforcement of R.C.C. works
Answer» E.
20.

*/*_The measurement is not made in square meters in case of?

A. D.P.C. (Damp proof course)
B. Form works
C. Concrete Jeffries
D. R.C. Chhajja
Answer» E.
21.

*/*_Cost of fittings and their fixing is specified for the following sanitary fittings?

A. Water closets
B. Flushing pipes
C. Lavatory basins
D. All the above
Answer» E.
22.

*/*_The item of the brick structure measured in sq.m, is?

A. Reinforced brick work
B. Broken glass coping
C. Brick edging
D. Brick work in arches
Answer» C. Brick edging
23.

*/*_The floor area includes the area of the balcony up to?

A. 100 %
B. 75 %
C. 50 %
D. 25 %
Answer» D. 25 %
24.

*/*_The assumption on which the trapezoidal formula for volumes is based, is?

A. The end sections are parallel planes
B. The mid-area of a pyramid is half the average area of the ends
C. The volume of the Prismoidal is over-estimated and hence a Prismoidal correction is applied
D. All the above
Answer» E.
25.

*/*_For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is?

A. 0.90 m³
B. 0.94 m³
C. 0.98 m³
D. 1.00 m³
Answer» C. 0.98 m¬¨‚â•
26.

*/*_Berms are provided in canals if these are?

A. Fully in excavation
B. Partly in excavation and partly in embankment
C. Fully in embankment
D. All the above
Answer» C. Fully in embankment
27.

*/*_Pick up the incorrect statement regarding a master trap from the following:?

A. It is provided in between the lower end of the house drain and the street sewer
B. It is provided a cleaning eye at the top of the trap
C. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
D. The water seal is less than that of ordinary traps
Answer» E.
28.

*/*_The value of 'C' of Indian type W.C. shown in the given figure is:?

A. 400 mm
B. 450 mm
C. 500 mm
D. 550 mm
Answer» D. 550 mm
29.

*/*_The area is measured correct to the nearest?

A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm
Answer» B. 0.02 sqm
30.

*/*_The cross-sectional area of the embankment of a canal fully in embankment in the given figure is?

A. ¬Ω (b‚ÇÅ + b‚ÇÇ) h
B. (b₁ + b₂) h + sb²
C. (b₁ + b₂) + 2sh²
D. 2 [(b₁ + b₂) (b + sh²)]
Answer» D. 2 [(b‚Äö√á√Ö + b‚Äö√á√á) (b + sh¬¨‚â§)]
31.

*/*_The expected out turn of cement concrete 1 : 2 : 4 per mason per day is?

A. 1.5 m³
B. 2.5 m³
C. 3.5 m³
D. 5.0 m³
Answer» E.
32.

*/*_Pick up the correct statement in case of water supply.?

A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. All the above
Answer» E.
33.

*/*_The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is?

A. d √ó d √ó s
B. ‚Äö√ √∂[d¬¨‚â§ ‚àö√≥ (ds)¬¨‚â§]
C. L.D ‚Äö√ √∂(1 + s¬¨‚â§)
D. 2 L.D ‚Äö√ √∂(1 + s¬¨‚â§)
Answer» D. 2 L.D ‚Äö√ √∂(1 + s¬¨‚â§)
34.

*/*_The rate of an item of work depends on?

A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. All the above
Answer» E.
35.

*/*_The order of booking dimensions is?

A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these
Answer» B. Breadth, length, height
36.

%_The order of booking dimensions is_%

A. Length, breadth, height
B. Breadth, length, height
C. Height, breadth, length
D. None of these
Answer» B. Breadth, length, height
37.

%_The area is measured correct to the nearest_%

A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm
Answer» B. 0.02 sqm
38.

%_The area of a sloping surface of a protective embankment of mean height‘d’, side slopes S: 1 and length ‘L’ is_%

A. d √ó d √ó s
B. ‚Äö√ √∂[d¬¨‚â§ ‚àö√≥ (ds)¬¨‚â§]
C. L.D ‚Äö√ √∂(1 + s¬¨‚â§)
D. 2 L.D ‚Äö√ √∂(1 + s¬¨‚â§)
Answer» D. 2 L.D ‚Äö√ √∂(1 + s¬¨‚â§)
39.

%_The rate of an item of work depends on_%

A. Specifications of works
B. Specifications of materials
C. Proportion of mortar
D. All the above
Answer» E.
40.

%_The cross-sectional area of the embankment of a canal fully in embankment in the given figure is_%

A. ¬Ω (b‚ÇÅ + b‚ÇÇ) h
B. (b₁ + b₂) h + sb²
C. (b₁ + b₂) + 2sh²
D. 2 [(b₁ + b₂) (b + sh²)]
Answer» D. 2 [(b‚Äö√á√Ö + b‚Äö√á√á) (b + sh¬¨‚â§)]
41.

%_Pick up the correct statement in case of water supply._%

A. Pipes laid in trenches and pipes fixed to walls are measured separately
B. Cutting through walls and floors are included with the item
C. Pipes are classified according to their sizes and quality
D. All the above
Answer» E.
42.

%_The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_%

A. 1.5 m³
B. 2.5 m³
C. 3.5 m³
D. 5.0 m³
Answer» E.
43.

%_Berms are provided in canals if these are_%

A. Fully in excavation
B. Partly in excavation and partly in embankment
C. Fully in embankment
D. All the above
Answer» C. Fully in embankment
44.

_ The excavation exceeding 1.5 m in width and 10 sq.m in plan area with a depth not exceeding 30 cm, is termed as$?

A. Excavation
B. Surface dressing
C. Cutting
D. Surface excavation
Answer» E.
45.

_ The height of the sink of wash basin above floor level is kept$?

A. 60 cm
B. 70 cm
C. 75 cm to 80 cm
D. 80 cm
Answer» D. 80 cm
46.

_ For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is$?

A. 0.90 m³
B. 0.94 m³
C. 0.98 m³
D. 1.00 m³
Answer» C. 0.98 m¬¨‚â•
47.

_ Pick up the incorrect statement regarding a master trap from the following:$?

A. It is provided in between the lower end of the house drain and the street sewer
B. It is provided a cleaning eye at the top of the trap
C. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
D. The water seal is less than that of ordinary traps
Answer» E.
48.

__The expected out turn of 2.5 cm cement concrete floor per mansion per day__

A. 2.5 sqm
B. 5.0 sqm
C. 7.5 sqm
D. 10 sqm
Answer» D. 10 sqm
49.

__The item of steel work which is measured in sq.m, is__

A. Collapsible gates
B. Rolling shutters
C. Ventilators and glazing
D. All the above
Answer» E.
50.

__A portion of an embankment having a uniform up-gradient 1 in 500 is circular with radius 1000 m of the centre line. It subtends 180° at the centre. If the height of the bank is 1 m at the lower end, and side slopes 2:1, the earth work involved.__

A. 26,000 m³
B. 26,500 m³
C. 27,000 m³
D. 27,500 m³
Answer» E.