51. |
__The correct Prismoidal formula for volume is__ |
A. | D [first area + last area + Ʃ Even area + 2 Ʃ odd areas] |
B. | D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas] |
C. | D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas] |
D. | D/6 [first area + last area + 2 ‚Äö√ √´ Even area + 4 ‚Äö√ √´ odd areas] |
Answer» C. D/3 [first area + last area + 2 ‚àܬ© Even area + 4 ‚àܬ© odd areas] | |
52. |
_The main factor to be considered while preparing a detailed estimate, is$? |
A. | Quantity of the materials |
B. | Availability of materials |
C. | Transportation of materials |
D. | All the above |
Answer» E. | |
53. |
_The volume is measured correct to the nearest$? |
A. | 0.01 cum |
B. | 0.02 cum |
C. | 0.03 cum |
D. | 0.04 cum |
Answer» B. 0.02 cum | |
54. |
_The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended$? |
A. | 100 mm |
B. | 150 mm |
C. | 200 mm |
D. | 175 mm |
Answer» C. 200 mm | |
55. |
_According to ISI method of measurement, the order of the sequence is$? |
A. | Length, breadth, height |
B. | Breadth, length, height |
C. | Height, length, breadth |
D. | None of these |
Answer» B. Breadth, length, height | |
56. |
_The inspection pit or chamber is a manhole provided in a base drainage system$? |
A. | At every change of direction |
B. | At every change of gradient |
C. | At every 30 m intervals |
D. | All the above |
Answer» E. | |
57. |
_The value of 'A' of Indian type W.C. shown in the given figure is:$? |
A. | 25 cm |
B. | 30 cm |
C. | 40 cm |
D. | 45 cm |
Answer» C. 40 cm | |
58. |
_As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken$? |
A. | 1.80 liters for 5 to 10 users |
B. | 1.20 liters for 15 users |
C. | 1.35 for 20 users |
D. | All the above |
Answer» E. | |
59. |
_The concrete work for the following part of the building of specified thickness is measured in square meters$? |
A. | Root slabs |
B. | Floors |
C. | Wall panels |
D. | All the above |
Answer» E. | |
60. |
_The brick work is not measured in cu m in case of$? |
A. | One or more than one brick wall |
B. | Brick work in arches |
C. | Reinforced brick work |
D. | Half brick wall |
Answer» E. | |
61. |
_The expected out turn of 12 mm plastering with cement mortar is$? |
A. | 2.5 sq m |
B. | 4.0 sq m |
C. | 6.0 sq m |
D. | 8.0 sq m |
Answer» E. | |
62. |
_Referring of given figure, pick up the correct statement from the following:$? |
A. | The total length of centre line of four walls is 20 m |
B. | Length of long wall out-to-out is 6.80 m |
C. | Length of short walls in-to-in is 3.20 m |
D. | All the above |
Answer» E. | |
63. |
_For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is$? |
A. | 0.200 m³ |
B. | 0.247 m³ |
C. | 0.274 m³ |
D. | 0.295 m³ |
Answer» D. 0.295 m¬¨‚â• | |
64. |
The weight of an item is measured correct to nearest$? |
A. | 0.25 kg |
B. | 0.50 kg |
C. | 0.75 kg |
D. | 1.00 kg |
Answer» E. | |
65. |
Brick walls are measured in sq. m if the thickness of the wall is$? |
A. | 10 cm |
B. | 15 cm |
C. | 20 cm |
D. | None of these |
Answer» B. 15 cm | |
66. |
Pick up the excavation where measurements are made in square meters for payment.$? |
A. | Ordinary cuttings up to 1 m |
B. | Surface dressing up to 15 cm depths |
C. | Surface excavation up to 30 cm depths |
D. | Both (B) and (C) |
Answer» E. | |
67. |
The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is$? |
A. | L + 0.42 d |
B. | L + (2 √ó 0.42 d) |
C. | L - (0.42 d) |
D. | L - (2 √ó 0.4 d) |
Answer» C. L - (0.42 d) | |
68. |
According to Indian Standards Institute, the actual size of modular bricks is$? |
A. | 23 cm √ó 11.5 cm √ó 7.5 cm |
B. | 25 cm √ó 13 cm √ó 7.5 cm |
C. | 19 cm √ó 9 cm √ó 9 cm |
D. | 20 cm √ó 10 cm √ó 10 cm |
Answer» D. 20 cm ‚àö√≥ 10 cm ‚àö√≥ 10 cm | |
69. |
Pick up the correct statement regarding the centre line method of estimating a building$? |
A. | Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item |
B. | The centre line is worked out separately for different sections of walls of a building |
C. | The centre line length is reduced by half the layer of main wall joining the partition wall |
D. | All the above |
Answer» E. | |
70. |
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is$? |
A. | 3250 m³ |
B. | 3225 m³ |
C. | 3275 m³ |
D. | 3300 m³ |
Answer» C. 3275 m¬¨‚â• | |
71. |
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and$? |
A. | Breadth of the wall |
B. | Half breadth of wall on each side |
C. | One fourth breadth of wall on each side |
D. | None of these |
Answer» C. One fourth breadth of wall on each side | |
72. |
The most reliable estimate is$? |
A. | Detailed estimate |
B. | Preliminary estimate |
C. | Plinth area estimate |
D. | Cube rate estimate |
Answer» B. Preliminary estimate | |
73. |
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds$? |
A. | 2.0 % |
B. | 2.5 % |
C. | 4.0 % |
D. | 5.0 % |
Answer» E. | |
74. |
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is$? |
A. | 500 m3 |
B. | 1000 m3 |
C. | 1500 m3 |
D. | 2000 m3 |
Answer» D. 2000 m3 | |
75. |
The measurement is made for stone work in square metre in case of$? |
A. | Wall facing |
B. | Columns, lintels, copings |
C. | Building work |
D. | (A) and (B) of the above |
Answer» E. | |
76. |
The damp proof course (D.P.C.) is measured in$? |
A. | Cub. m |
B. | Sq. m |
C. | Meters |
D. | None of these |
Answer» C. Meters | |
77. |
While estimating the qualities for the construction of a building, the correct metric unit is$? |
A. | Meter for length |
B. | Cubic metre for area |
C. | Square meters for volume |
D. | Liter for capacity |
Answer» E. | |
78. |
In the mid-section formula$? |
A. | The mean depth is the average of depths of two consecutive sections |
B. | The area of mid-sections is calculated by using mean depth |
C. | The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections |
D. | All of the above |
Answer» E. | |
79. |
The most reliable estimate is? |
A. | Detailed estimate |
B. | Preliminary estimate |
C. | Plinth area estimate |
D. | Cube rate estimate |
Answer» B. Preliminary estimate | |
80. |
While estimating the qualities for the construction of a building, the correct metric unit is? |
A. | Meter for length |
B. | Cubic metre for area |
C. | Square meters for volume |
D. | Liter for capacity |
Answer» E. | |
81. |
The damp proof course (D.P.C.) is measured in? |
A. | Cub. m |
B. | Sq. m |
C. | Meters |
D. | None of these |
Answer» C. Meters | |
82. |
In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and? |
A. | Breadth of the wall |
B. | Half breadth of wall on each side |
C. | One fourth breadth of wall on each side |
D. | None of these |
Answer» C. One fourth breadth of wall on each side | |
83. |
In the mid-section formula? |
A. | The mean depth is the average of depths of two consecutive sections |
B. | The area of mid-sections is calculated by using mean depth |
C. | The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections |
D. | All of the above |
Answer» E. | |
84. |
Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds? |
A. | 2.0 % |
B. | 2.5 % |
C. | 4.0 % |
D. | 5.0 % |
Answer» E. | |
85. |
The measurement is made for stone work in square metre in case of? |
A. | Wall facing |
B. | Columns, lintels, copings |
C. | Building work |
D. | (A) and (B) of the above |
Answer» E. | |
86. |
A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is? |
A. | 500 m3 |
B. | 1000 m3 |
C. | 1500 m3 |
D. | 2000 m3 |
Answer» D. 2000 m3 | |
87. |
According to Indian Standards Institute, the actual size of modular bricks is? |
A. | 23 cm √ó 11.5 cm √ó 7.5 cm |
B. | 25 cm √ó 13 cm √ó 7.5 cm |
C. | 19 cm √ó 9 cm √ó 9 cm |
D. | 20 cm √ó 10 cm √ó 10 cm |
Answer» D. 20 cm ‚àö√≥ 10 cm ‚àö√≥ 10 cm | |
88. |
Size, capacity and materials need be specified for? |
A. | Bib-cocks |
B. | Stop-cocks |
C. | Ball valves |
D. | All the above |
Answer» E. | |
89. |
Pick up the correct statement regarding the centre line method of estimating a building? |
A. | Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item |
B. | The centre line is worked out separately for different sections of walls of a building |
C. | The centre line length is reduced by half the layer of main wall joining the partition wall |
D. | All the above |
Answer» E. | |
90. |
The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is? |
A. | 3250 m³ |
B. | 3225 m³ |
C. | 3275 m³ |
D. | 3300 m³ |
Answer» C. 3275 m¬¨‚â• | |
91. |
The expected out turn for earth work in excavation in ordinary soil per workman per day is |
A. | 1.00 cum |
B. | 2.00 cum |
C. | 3.00 cum |
D. | 4.00 cum |
Answer» D. 4.00 cum | |
92. |
If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is$ |
A. | 30 D |
B. | 39 D |
C. | 50 D |
D. | 59 D |
Answer» E. | |
93. |
The slope of the outlet of 'P trap' below the horizontal is kept |
A. | 8° |
B. | 10° |
C. | 12° |
D. | 14° |
Answer» E. | |
94. |
The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is |
A. | ⅓ × (b - rd)²/(r - s) |
B. | ⅓ × (b - rd)²/(r + s) |
C. | ½ × (b + rd)²/(r - s) |
D. | ⅓ × (b - rd)²/(s - r) |
Answer» B. ‚Äö√ñ√¨ ‚àö√≥ (b - rd)¬¨‚â§/(r + s) | |