51.

__The correct Prismoidal formula for volume is__

A. D [first area + last area + Ʃ Even area + 2 Ʃ odd areas]
B. D/3 [first area + last area + 4 Ʃ Even area + 2 Ʃ odd areas]
C. D/3 [first area + last area + 2 Ʃ Even area + 4 Ʃ odd areas]
D. D/6 [first area + last area + 2 ‚Äö√ √´ Even area + 4 ‚Äö√ √´ odd areas]
Answer» C. D/3 [first area + last area + 2 ‚àܬ© Even area + 4 ‚àܬ© odd areas]
52.

_The main factor to be considered while preparing a detailed estimate, is$?

A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. All the above
Answer» E.
53.

_The volume is measured correct to the nearest$?

A. 0.01 cum
B. 0.02 cum
C. 0.03 cum
D. 0.04 cum
Answer» B. 0.02 cum
54.

_The diameter of a domestic sewer pipe laid at gradient 1 in 100 is recommended$?

A. 100 mm
B. 150 mm
C. 200 mm
D. 175 mm
Answer» C. 200 mm
55.

_According to ISI method of measurement, the order of the sequence is$?

A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these
Answer» B. Breadth, length, height
56.

_The inspection pit or chamber is a manhole provided in a base drainage system$?

A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above
Answer» E.
57.

_The value of 'A' of Indian type W.C. shown in the given figure is:$?

A. 25 cm
B. 30 cm
C. 40 cm
D. 45 cm
Answer» C. 40 cm
58.

_As per Indian Standard Specifications, the peak discharge for domestic purposes per capita per minute, is taken$?

A. 1.80 liters for 5 to 10 users
B. 1.20 liters for 15 users
C. 1.35 for 20 users
D. All the above
Answer» E.
59.

_The concrete work for the following part of the building of specified thickness is measured in square meters$?

A. Root slabs
B. Floors
C. Wall panels
D. All the above
Answer» E.
60.

_The brick work is not measured in cu m in case of$?

A. One or more than one brick wall
B. Brick work in arches
C. Reinforced brick work
D. Half brick wall
Answer» E.
61.

_The expected out turn of 12 mm plastering with cement mortar is$?

A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m
Answer» E.
62.

_Referring of given figure, pick up the correct statement from the following:$?

A. The total length of centre line of four walls is 20 m
B. Length of long wall out-to-out is 6.80 m
C. Length of short walls in-to-in is 3.20 m
D. All the above
Answer» E.
63.

_For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is$?

A. 0.200 m³
B. 0.247 m³
C. 0.274 m³
D. 0.295 m³
Answer» D. 0.295 m¬¨‚â•
64.

The weight of an item is measured correct to nearest$?

A. 0.25 kg
B. 0.50 kg
C. 0.75 kg
D. 1.00 kg
Answer» E.
65.

Brick walls are measured in sq. m if the thickness of the wall is$?

A. 10 cm
B. 15 cm
C. 20 cm
D. None of these
Answer» B. 15 cm
66.

Pick up the excavation where measurements are made in square meters for payment.$?

A. Ordinary cuttings up to 1 m
B. Surface dressing up to 15 cm depths
C. Surface excavation up to 30 cm depths
D. Both (B) and (C)
Answer» E.
67.

The total length of a cranked bar through a distance (d) at 45° in case of a beam of effective length L, is$?

A. L + 0.42 d
B. L + (2 √ó 0.42 d)
C. L - (0.42 d)
D. L - (2 √ó 0.4 d)
Answer» C. L - (0.42 d)
68.

According to Indian Standards Institute, the actual size of modular bricks is$?

A. 23 cm √ó 11.5 cm √ó 7.5 cm
B. 25 cm √ó 13 cm √ó 7.5 cm
C. 19 cm √ó 9 cm √ó 9 cm
D. 20 cm √ó 10 cm √ó 10 cm
Answer» D. 20 cm ‚àö√≥ 10 cm ‚àö√≥ 10 cm
69.

Pick up the correct statement regarding the centre line method of estimating a building$?

A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
B. The centre line is worked out separately for different sections of walls of a building
C. The centre line length is reduced by half the layer of main wall joining the partition wall
D. All the above
Answer» E.
70.

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is$?

A. 3250 m³
B. 3225 m³
C. 3275 m³
D. 3300 m³
Answer» C. 3275 m¬¨‚â•
71.

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and$?

A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
Answer» C. One fourth breadth of wall on each side
72.

The most reliable estimate is$?

A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
Answer» B. Preliminary estimate
73.

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds$?

A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %
Answer» E.
74.

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is$?

A. 500 m3
B. 1000 m3
C. 1500 m3
D. 2000 m3
Answer» D. 2000 m3
75.

The measurement is made for stone work in square metre in case of$?

A. Wall facing
B. Columns, lintels, copings
C. Building work
D. (A) and (B) of the above
Answer» E.
76.

The damp proof course (D.P.C.) is measured in$?

A. Cub. m
B. Sq. m
C. Meters
D. None of these
Answer» C. Meters
77.

While estimating the qualities for the construction of a building, the correct metric unit is$?

A. Meter for length
B. Cubic metre for area
C. Square meters for volume
D. Liter for capacity
Answer» E.
78.

In the mid-section formula$?

A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
D. All of the above
Answer» E.
79.

The most reliable estimate is?

A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
Answer» B. Preliminary estimate
80.

While estimating the qualities for the construction of a building, the correct metric unit is?

A. Meter for length
B. Cubic metre for area
C. Square meters for volume
D. Liter for capacity
Answer» E.
81.

The damp proof course (D.P.C.) is measured in?

A. Cub. m
B. Sq. m
C. Meters
D. None of these
Answer» C. Meters
82.

In long and short wall method of estimation, the length of long wall is the centre to centre distance between the walls and?

A. Breadth of the wall
B. Half breadth of wall on each side
C. One fourth breadth of wall on each side
D. None of these
Answer» C. One fourth breadth of wall on each side
83.

In the mid-section formula?

A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
D. All of the above
Answer» E.
84.

Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds?

A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 %
Answer» E.
85.

The measurement is made for stone work in square metre in case of?

A. Wall facing
B. Columns, lintels, copings
C. Building work
D. (A) and (B) of the above
Answer» E.
86.

A cement concrete road is 1000 m long, 8 m wide and 15 cm thick over the sub-base of 10 cm thick gravel. The box cutting in road crust is?

A. 500 m3
B. 1000 m3
C. 1500 m3
D. 2000 m3
Answer» D. 2000 m3
87.

According to Indian Standards Institute, the actual size of modular bricks is?

A. 23 cm √ó 11.5 cm √ó 7.5 cm
B. 25 cm √ó 13 cm √ó 7.5 cm
C. 19 cm √ó 9 cm √ó 9 cm
D. 20 cm √ó 10 cm √ó 10 cm
Answer» D. 20 cm ‚àö√≥ 10 cm ‚àö√≥ 10 cm
88.

Size, capacity and materials need be specified for?

A. Bib-cocks
B. Stop-cocks
C. Ball valves
D. All the above
Answer» E.
89.

Pick up the correct statement regarding the centre line method of estimating a building?

A. Product of the centre line of the walls and area of cross-section of any item, gives total quantity of the item
B. The centre line is worked out separately for different sections of walls of a building
C. The centre line length is reduced by half the layer of main wall joining the partition wall
D. All the above
Answer» E.
90.

The ground surface slopes 1 in 50 along a proposed railway embankment 150 m in length. The height of the embankment at zero chainage is 0.5 m, the width is 11 m and side slopes 2:1. If the falling gradient of the embankment is 1 in 150, the quantity of the earthwork calculated by Prismoidal formula, is?

A. 3250 m³
B. 3225 m³
C. 3275 m³
D. 3300 m³
Answer» C. 3275 m¬¨‚â•
91.

The expected out turn for earth work in excavation in ordinary soil per workman per day is

A. 1.00 cum
B. 2.00 cum
C. 3.00 cum
D. 4.00 cum
Answer» D. 4.00 cum
92.

If tensile stress of a steel rod of diameter ‘D’ is 1400 kg/cm² and bond stress is 6 kg/cm², the required bond length of the rod is$

A. 30 D
B. 39 D
C. 50 D
D. 59 D
Answer» E.
93.

The slope of the outlet of 'P trap' below the horizontal is kept

A. 8°
B. 10°
C. 12°
D. 14°
Answer» E.
94.

The cross-section of a road partly in banking and partly in cutting is shown in the given figure. The area of the shaded portion is

A. ⅓ × (b - rd)²/(r - s)
B. ⅓ × (b - rd)²/(r + s)
C. ½ × (b + rd)²/(r - s)
D. ⅓ × (b - rd)²/(s - r)
Answer» B. ‚Äö√ñ√¨ ‚àö√≥ (b - rd)¬¨‚â§/(r + s)