 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 20 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. | The polished stone value for aggregate of surface course should be more than __________ | 
| A. | 15 | 
| B. | 25 | 
| C. | 35 | 
| D. | 55 | 
| Answer» E. | |
| 2. | The water sensitivity of aggregates should retain __________ | 
| A. | 75% of tensile strength | 
| B. | 80% of tensile strength | 
| C. | 95% of tensile strength | 
| D. | 100% of tensile strength | 
| Answer» C. 95% of tensile strength | |
| 3. | The spreading test performed on bitumen can be checked on metal plates of dimensions is? | 
| A. | 200*200mm | 
| B. | 300*300mm | 
| C. | 400*400mm | 
| D. | 500*500mm | 
| Answer» B. 300*300mm | |
| 4. | The interface bond between the existing pavement and new pavement is provided by __________ | 
| A. | Tack coat | 
| B. | Prime coat | 
| C. | Bitumen | 
| D. | Oil | 
| Answer» B. Prime coat | |
| 5. | What is the minimum thickness used in bituminous macadam? | 
| A. | 25 mm | 
| B. | 50 mm | 
| C. | 75 mm | 
| D. | 100 mm | 
| Answer» D. 100 mm | |
| 6. | The camber is checked at every interval of __________ | 
| A. | 10 m | 
| B. | 20 m | 
| C. | 30 m | 
| D. | 40 m | 
| Answer» B. 20 m | |
| 7. | The stripping of aggregate should be less than __________ | 
| A. | 12 | 
| B. | 25 | 
| C. | 35 | 
| D. | 45 | 
| Answer» C. 35 | |
| 8. | Built up spray grout consists of __________ | 
| A. | One layer | 
| B. | Two layers | 
| C. | Three layers | 
| D. | Indefinite layers | 
| Answer» C. Three layers | |
| 9. | How many kg of binder is applied for 10m2 area? | 
| A. | 68 kg | 
| B. | 71 kg | 
| C. | 82 kg | 
| D. | 93 kg | 
| Answer» B. 71 kg | |
| 10. | The loss with sodium sulphate cycles for aggregate used for bitumen is __________ | 
| A. | Less than 12% | 
| B. | Less than 15% | 
| C. | Less than 16% | 
| D. | Less than 20% | 
| Answer» B. Less than 15% | |
| 11. | THE_POLISHED_STONE_VALUE_FOR_AGGREGATE_OF_SURFACE_COURSE_SHOULD_BE_MORE_THAN?$ | 
| A. | 15 | 
| B. | 25 | 
| C. | 35 | 
| D. | 55 | 
| Answer» E. | |
| 12. | THE_WATER_SENSITIVITY_OF_AGGREGATES_SHOULD_RETAIN?$ | 
| A. | 75% of tensile strength | 
| B. | 80% of tensile strength | 
| C. | 95% of tensile strength | 
| D. | 100% of tensile strength | 
| Answer» C. 95% of tensile strength | |
| 13. | The spreading test performed on bitumen can be checked on metal plates of dimension? | 
| A. | 200*200mm | 
| B. | 300*300mm | 
| C. | 400*400mm | 
| D. | 500*500mm | 
| Answer» B. 300*300mm | |
| 14. | The interface bond between existing pavement and new pavement is provided by | 
| A. | Tack coat | 
| B. | Prime coat | 
| C. | Bitumen | 
| D. | Oil | 
| Answer» B. Prime coat | |
| 15. | The minimum thickness used in bituminous macadam is | 
| A. | 25 mm | 
| B. | 50 mm | 
| C. | 75 mm | 
| D. | 100 mm | 
| Answer» D. 100 mm | |
| 16. | The camber is checked at every interval of | 
| A. | 10 m | 
| B. | 20 m | 
| C. | 30 m | 
| D. | 40 m | 
| Answer» B. 20 m | |
| 17. | The stripping of aggregate should be less than | 
| A. | 12 | 
| B. | 25 | 
| C. | 35 | 
| D. | 45 | 
| Answer» C. 35 | |
| 18. | Built up spray grout consists of | 
| A. | One layer | 
| B. | Two layers | 
| C. | Three layers | 
| D. | Indefinite layers | 
| Answer» C. Three layers | |
| 19. | How many kg of binder is applied for 10m2 area? | 
| A. | 68 kg | 
| B. | 71 kg | 
| C. | 82 kg | 
| D. | 93 kg | 
| Answer» B. 71 kg | |
| 20. | The loss with sodium sulphate cycles for aggregate used for bitumen is | 
| A. | Less than 12% | 
| B. | Less than 15% | 
| C. | Less than 16% | 
| D. | Less than 20% | 
| Answer» B. Less than 15% | |