MCQOPTIONS
Saved Bookmarks
This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
Highway should be planned for __________ |
| A. | Present requirements |
| B. | Traffic developments |
| C. | Traffic studies |
| D. | Present requirements and future requirements |
| Answer» E. | |
| 2. |
The planning, design and construction of either a network of new roads or road link is called __________ |
| A. | Highway project |
| B. | Highway estimate |
| C. | Highway interlinking |
| D. | Highway design |
| Answer» B. Highway estimate | |
| 3. |
The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as __________ |
| A. | Feasibility report |
| B. | Detailed project report |
| C. | Survey report |
| D. | Primary report |
| Answer» C. Survey report | |
| 4. |
The approximate cost of construction evaluated for the project is called __________ |
| A. | Project report |
| B. | Project feasibility |
| C. | Estimate |
| D. | Detailed project report |
| Answer» D. Detailed project report | |
| 5. |
The cross sections should be drawn for every __________ |
| A. | 10m |
| B. | 20m |
| C. | 50m |
| D. | 100m |
| Answer» E. | |
| 6. |
The index map shows __________ |
| A. | Topography |
| B. | Soil |
| C. | Area of the site |
| D. | Plan |
| Answer» B. Soil | |
| 7. |
The New highway project is divided into how many stages? |
| A. | One |
| B. | Two |
| C. | Three |
| D. | Four |
| Answer» E. | |
| 8. |
Highway should be planned for |
| A. | Present requirements |
| B. | Traffic developments |
| C. | Traffic studies |
| D. | Present requirements and future requirements |
| Answer» B. Traffic developments | |
| 9. |
The planning, design and construction of either a network of new roads or road link is called |
| A. | Highway project |
| B. | Highway estimate |
| C. | Highway interlinking |
| D. | Highway design |
| Answer» E. | |
| 10. |
The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as |
| A. | Feasibility report |
| B. | Detailed project report |
| C. | Survey report |
| D. | Primary report |
| Answer» D. Primary report | |
| 11. |
The approximate cost of construction evaluated for the project is called |
| A. | Project report |
| B. | Project feasibility |
| C. | Estimate |
| D. | Detailed project report |
| Answer» E. | |
| 12. |
The cross sections should be drawn for every |
| A. | 10m |
| B. | 20m |
| C. | 50m |
| D. | 100m |
| Answer» C. 50m | |
| 13. |
Detailed size drawings are prepared in which sheet? |
| A. | A1 |
| B. | A2 |
| C. | A3 |
| D. | A4 |
| Answer» B. A2 | |