| 1. |
The site amenities are covered under which of the items of DPR? |
| A. | Background |
| B. | Abstract |
| C. | Miscellaneous |
| D. | Estimate |
| Answer» D. Estimate | |
| 2. |
For small projects which type of method is used for the calculation of project time? |
| A. | Milestone chart |
| B. | Bar chart |
| C. | PERT |
| D. | CPM |
| Answer» C. PERT | |
| 3. |
The strength of the materials can be checked by ___________ |
| A. | Visual inspection |
| B. | Quality control |
| C. | By asking the manufacturer |
| D. | By referring to various codes |
| Answer» C. By asking the manufacturer | |
| 4. |
The final step in the specifications and design of roadway elements is ___________ |
| A. | Specifications |
| B. | Design elements |
| C. | Geometric design |
| D. | Safety and audit of the design elements |
| Answer» E. | |
| 5. |
The roadway features include the study of ___________ |
| A. | Accidental analysis |
| B. | Geometric design |
| C. | Route alignment |
| D. | Safety |
| Answer» D. Safety | |
| 6. |
The first step in the detail checklist of DPR is ___________ |
| A. | Executive summary |
| B. | Background |
| C. | Roadway features |
| D. | General details of the project |
| Answer» B. Background | |
| 7. |
THE_SITE_AMENITIES_ARE_COVERED_UNDER_WHICH_OF_THE_ITEMS_OF_DPR??$ |
| A. | Background |
| B. | Abstract |
| C. | Miscellaneous |
| D. | Estimate |
| Answer» D. Estimate | |
| 8. |
Which of the following is prepared first during estimate? |
| A. | Schedule of rates |
| B. | Rate analysis |
| C. | Detailed cost estimate |
| D. | Detailed project |
| Answer» B. Rate analysis | |
| 9. |
For small projects which type of method is used for calculation of project time? |
| A. | Milestone chart |
| B. | Bar chart |
| C. | PERT |
| D. | CPM |
| Answer» C. PERT | |
| 10. |
The strength of the materials can be checked by |
| A. | Visual inspection |
| B. | Quality control |
| C. | By asking the manufacturer |
| D. | By referring to various codes |
| Answer» C. By asking the manufacturer | |
| 11. |
Which of the following is not a structure constructed for drainage purposes? |
| A. | Aqueduct |
| B. | Syphon aqueduct |
| C. | Level crossing |
| D. | Pitot tube |
| Answer» E. | |
| 12. |
The final step in the specifications and design of roadway elements is |
| A. | Specifications |
| B. | Design elements |
| C. | Geometric design |
| D. | Safety and audit of the design elements |
| Answer» E. | |
| 13. |
The roadway features include the study of |
| A. | Accidental analysis |
| B. | Geometric design |
| C. | Route alignment |
| D. | Safety |
| Answer» D. Safety | |
| 14. |
The name of the work and project details is managed under which category of DPR? |
| A. | Executive summary |
| B. | Background |
| C. | Roadway details |
| D. | General details |
| Answer» C. Roadway details | |
| 15. |
The first step in the detail checklist of DPR is |
| A. | Executive summary |
| B. | Background |
| C. | Roadway features |
| D. | General details of the project |
| Answer» B. Background | |
| 16. |
The DPR consists of how many components? |
| A. | One |
| B. | Two |
| C. | Three |
| D. | Four |
| Answer» D. Four | |