The total project cost consists of two components ..
1.
The total project cost consists of two components namely front cost and indirect cost.$
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
FOR_COST_ESTIMATING,__________SERVES_AS_AN_IMPORTANT_FRAMEWORK_FOR_ORGANIZED_COLLECTION_PROJECT_COST_DATA_AND_PREPARING_THE_COST_ESTIMATES_AT_DIFFERENT_LEVELS.?$
The total project cost consists of two components namely front cost and indirect cost.$
Generally for any construction project, three parties are involved namely owner, design professionals and construction professionals.$
A______________ may be included in an estimate to provide for unknown costs which are indicated as likely to occur by experience, but are not identifiable?
The measurement is made for stone work in square metre in case of __________
For 100 sq. m cement concrete (1 : 2: 4) 4 cm thick floor, the quantity of cement required, is ________
The area of a sloping surface of a protective embankment of mean height d, side slopes S: 1 and length L is _________
According to ISI method of measurement, the order of the sequence is ___________
Which is not a transaction type of Public work office grouped under?
In P.W.D who is the primary disbursing officer who is supplied with cheque books on district treasuries of India.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply