MCQOPTIONS
Bookmark
Saved Bookmarks
→
Civil Engineering
→
Hydraulics And Fluid Mechanics in Civil Engineering
→
The total project cost consists of two components ..
1.
The total project cost consists of two components namely front cost and indirect cost.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Which is not the essential quality of a good surveyor?
Which method is not adopted for volume calculating?
The estimate which prepared using any rough method to get the approximate cost construction anticipated in a project is called an ______________ estimate.
For cost estimating _________ serves as an important framework for organized collection project cost data and preparing the cost estimates at different levels.
A ______________ may be included in an estimate to provide for unknown costs which are indicated as likely to occur by experience, but are not identifiable.
WHICH_IS_NOT_THE_ESSENTIAL_QUALITY_OF_A_GOOD_SURVEYOR??$
Which option is not considered as the duty of quantity surveyor?
The measurement is not made in square metres in case of ____________
For cost estimating, _________serves as an important framework for organized collection project cost data and preparing the cost estimates at different levels.
The total project cost consists of two components namely front cost and indirect cost.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply