The re gravelled course is checked at a distance o..
1.
The re gravelled course is checked at a distance of every ___________
A.
10 m
B.
20 m
C.
50 m
D.
100 m
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Shear failure are classified into how many types?
An existing flexible pavement that develops extensive cracks is called ___________
The distress not caused in localised form is ___________
The WBM mostly get damaged in ___________
The dust palliative not used for reducing dust is ___________
The re gravelled course is checked at a distance of every ___________
The defects like pot holes, corrugation, rutting can be rectified by ___________
The cross slope required for the correction of shoulder is?
Common types of unsurfaced roads adopted in India are ___________
The measure not adopted in reconstruction of new highway is _____________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply