1.
The overlay design is laid for a maximum life span of __________
A.
5 years
B.
7 years
C.
9 years
D.
10 years
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The joint filling sand should have fines are __________
The least lane distribution factor value is least for __________
The lane distribution factor on undivided roads with single lane carriage way is __________
The depth of rutting criterion is obtained by __________
The VDF in hilly terrain for CVPD less than 1500 is?
The VDF of a lane if the CVPD is greater than 1500 in plain terrain is?
The average vehicles considered for pavement studies are __________
What is the most commonly used overlay?
The overlay design is laid for a maximum life span of __________
Axle load studies are carried out on a minimum sample of __________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply