1.
The number of steps followed for surface drainage system is __________
A.
One
B.
Two
C.
Three
D.
Four
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
For a bitumen pavement calculate the discharge in m3/sec if intensity of the rainfall is 40 mm/sec and area of drainage is 100 m<sup>2</sup>.
The area of the drainage is expressed in __________
What is the minimum velocity required in drainage to maintain flow?
The rational formula is __________
The number of steps followed for surface drainage system is __________
The factors not affecting run off is?
The portion of water which flows on surface is called __________
What is the objective of hydrological analysis?
The design aspects of the surface drainage system are classified into how many types?
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply