MCQOPTIONS
Bookmark
Saved Bookmarks
→
Highway Engineering
→
Embankment Subgrade in Highway Engineering
→
The diameter of the holes in the mud jacking proce..
1.
The diameter of the holes in the mud jacking process is?
A.
10 mm
B.
15 mm
C.
20 mm
D.
30 mm
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
IF_A_PART_OF_CEMENT_MORTAR_GETS_DETACHED_FROM_THE_SURFACE,_EXPOSING_THE_COARSE_AGGREGATE_WHICH_RESULTS_IN_A_ROUGH_SURFACE,_THEN_IT_IS_CALLED.?$
The ravelling occurs due to.$
The factor not related to scaling of the concrete is.$
The shrinkage cracks have a length of.
The poly sulphide sealant perform well uptown.
The CC pavement should be construed again if ravelling depth is more than.
The CC pavement is considered good quality of the unevenness index in mm/km is less than.
The diameter of the holes in the mud jacking process is?
The factor which doesn’t initiate mud is.$
The process of mud or soil being ejected out through the joints and edges of the CC pavements is called.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply