How is the height of the sludge calculated in a sludge drying bed? |
| A. | H<sub>t</sub>-H<sub>x</sub>=(H<sub>2</sub>-H<sub>x</sub>)ei<sup>t2</sup> |
| B. | H<sub>t</sub>=(H<sub>2</sub>-H<sub>x</sub>)ei<sup>t2</sup> |
| C. | H<sub>t</sub>-H<sub>x</sub>=(H<sub>2</sub>)ei<sup>t2</sup> |
| D. | H<sub>t</sub>-H<sub>x</sub>=(H<sub>x</sub>)ei<sup>t2</sup> |
| Answer» B. H<sub>t</sub>=(H<sub>2</sub>-H<sub>x</sub>)ei<sup>t2</sup> | |