| 1. | For which of the following reason SSMP is not used? | 
| A. | Minimizing sanitary sewer overflows | 
| B. | Minimizing infiltration/ inflow | 
| C. | Reducing sewer size | 
| D. | Maintaining the condition of a collection system | 
| Answer» D. Maintaining the condition of a collection system | |
| 2. | What is the abbreviation of SSMP? | 
| A. | Storm and Sewage Management Plan | 
| B. | Sewer System Management Plan | 
| C. | Soil and Storm Management Plan | 
| D. | Storm System Management Plan | 
| Answer» C. Soil and Storm Management Plan | |
| 3. | The type of wastewater treatment process for treating wastewater or industrial wastewater using aeration and biological flocs is called? | 
| A. | Active sludge process | 
| B. | Aeration | 
| C. | Biological aeration | 
| D. | Anaerobic digestion | 
| Answer» B. Aeration | |
| 4. | THE_TYPE_OF_WASTEWATER_TREATMENT_PROCESS_FOR_TREATING_WASTEWATER_OR_INDUSTRIAL_WASTEWATER_USING_AERATION_AND_BIOLOGICAL_FLOCS_IS_CALLED??$ | 
| A. | Active sludge process | 
| B. | Aeration | 
| C. | Biological aeration | 
| D. | Anaerobic digestion | 
| Answer» B. Aeration | |
| 5. | For which of the following reason SSMP is not used?$ | 
| A. | Minimizing sanitary sewer overflows | 
| B. | Minimizing infiltration/ inflow | 
| C. | Reducing sewer size | 
| D. | Maintaining the condition of a collection system | 
| Answer» D. Maintaining the condition of a collection system | |
| 6. | What is the abbreviation of SSMP?$ | 
| A. | Storm and Sewage Management Plan | 
| B. | Sewer System Management Plan | 
| C. | Soil and Storm Management Plan | 
| D. | Storm System Management Plan | 
| Answer» C. Soil and Storm Management Plan | |
| 7. | SORP stands for? | 
| A. | Storm Overflow Response Plan | 
| B. | Sewer Overflow Response Plan | 
| C. | Sanitary Overflow Response Plan | 
| D. | Sewage Overflow Response Plan | 
| Answer» C. Sanitary Overflow Response Plan | |
| 8. | The legal entity that is responsible for the wastewater collection system is called ___________ | 
| A. | Collection system agency | 
| B. | Sewer system agency | 
| C. | Water collection agency | 
| D. | Storm collection agency | 
| Answer» C. Water collection agency | |
| 9. | SSMPs are used to minimize the number and impact of sanitary sewer overflows that occur. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 10. | Which of these is the most common pipeline installation method? | 
| A. | Trench sewer construction | 
| B. | Storm sewer construction | 
| C. | Pipeline construction | 
| D. | Tunnel construction | 
| Answer» B. Storm sewer construction | |
| 11. | The abbreviation of SUE is? | 
| A. | Subsurface utility engineering | 
| B. | Surface utility engineering | 
| C. | Storm usage engineering | 
| D. | Storm utility engineering | 
| Answer» B. Surface utility engineering | |
| 12. | Which of the following factors mentioned below marks essential for planning sewer systems for a community? | 
| A. | Usage pattern | 
| B. | Terrain | 
| C. | Location | 
| D. | Wastewater flow | 
| Answer» E. | |
| 13. | Combined sewer systems are no longer installed due to the water pollution problems they present. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 14. | __________ is required to transport storm water runoff from roofs, parking lots, streets, and highways to a point of discharge. | 
| A. | Sanitary sewers | 
| B. | Storm sewers | 
| C. | Wastewater sewers | 
| D. | Water sewers | 
| Answer» C. Wastewater sewers | |
| 15. | On which of the factors mentioned below, the type of the sewer installed does not depend on? | 
| A. | Usage pattern | 
| B. | Terrain | 
| C. | location | 
| D. | storm water | 
| Answer» E. | |
| 16. | Sewer systems can also be referred as _________ | 
| A. | Sewage | 
| B. | Sewerage | 
| C. | Storm | 
| D. | Wastewater | 
| Answer» C. Storm | |
| 17. | Pipeline networks are designed by engineers and installed by sewer contractors in accordance with federal and state regulations. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 18. | The process that involves connecting pipelines and sewer appurtenances to transport waste to sewage treatment centres is called? | 
| A. | Connecting pipelines | 
| B. | Pipelines construction | 
| C. | Sewer construction | 
| D. | Sewage construction | 
| Answer» D. Sewage construction | |