How is the height of the sludge calculated in a sludge drying bed?

A. H<sub>t</sub>-H<sub>x</sub>=(H<sub>2</sub>-H<sub>x</sub>)ei<sup>t2</sup>
B. H<sub>t</sub>=(H<sub>2</sub>-H<sub>x</sub>)ei<sup>t2</sup>
C. H<sub>t</sub>-H<sub>x</sub>=(H<sub>2</sub>)ei<sup>t2</sup>
D. H<sub>t</sub>-H<sub>x</sub>=(H<sub>x</sub>)ei<sup>t2</sup>
Answer» B. H<sub>t</sub>=(H<sub>2</sub>-H<sub>x</sub>)ei<sup>t2</sup>