

MCQOPTIONS
Saved Bookmarks
This section includes 64 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
51. |
The charts showing the variation of the traffic is called$ |
A. | Traffic chart |
B. | Trend chart |
C. | Variation chart |
D. | Traffic flow maps |
Answer» D. Traffic flow maps | |
52. |
The_traffic_that_is_prepared_based_on_365_days_of_the_year_is_called$ |
A. | Yearly traffic |
B. | Annual average daily traffic |
C. | Average daily traffic |
D. | Average yearly traffic |
Answer» C. Average daily traffic | |
53. |
The ratio of seven day average for 24 hour and 24 hour count on any particular day is |
A. | Daily factor |
B. | Seasonal factor |
C. | Annual factor |
D. | Weekly factor |
Answer» B. Seasonal factor | |
54. |
If the traffic volume count on a road is 150 and daily factor is 1.1 and seasonal factor is 1.2 then ADT is |
A. | 196 |
B. | 197 |
C. | 198 |
D. | 199 |
Answer» D. 199 | |
55. |
The 5 minute count at a traffic junction is 15 find the hourly count |
A. | 50 |
B. | 100 |
C. | 120 |
D. | 180 |
Answer» E. | |
56. |
The traffic design in India is based on |
A. | 10th hourly volume |
B. | 20th hourly volume |
C. | 30th hourly volume |
D. | 45th hourly volume |
Answer» D. 45th hourly volume | |
57. |
Which of the following method is more accurate for traffic analysis? |
A. | Manual count |
B. | Automatic count |
C. | Average of manual and automatic |
D. | Past records |
Answer» C. Average of manual and automatic | |
58. |
Pedestrian data is used for planning |
A. | Highway |
B. | Sidewalks and cross-walks |
C. | Kerb |
D. | Camber |
Answer» C. Kerb | |
59. |
The first objective of the traffic volume studies is |
A. | To decide priority for improvement of roads |
B. | For geometric design |
C. | For computing roadway capacity |
D. | To plan traffic operation |
Answer» B. For geometric design | |
60. |
The traffic flow is |
A. | Static |
B. | Dynamic |
C. | Static and dynamic |
D. | May be static or dynamic |
Answer» C. Static and dynamic | |
61. |
HCV stands for |
A. | Heavy commercial vehicle |
B. | Heavy cash vehicle |
C. | Heavy consolidated vehicle |
D. | Hard commercial vehicle |
Answer» B. Heavy cash vehicle | |
62. |
The number of vehicles that pass through a transverse line of road at a given time in a specified direction is called |
A. | Traffic studies |
B. | Traffic flow |
C. | Traffic origin |
D. | Traffic destination |
Answer» C. Traffic origin | |
63. |
The traffic volume is usually expressed in |
A. | LMV |
B. | PCU |
C. | LCV |
D. | HCV |
Answer» C. LCV | |
64. |
The first stage in the traffic engineering studies is |
A. | Traffic volume studies |
B. | Spot speed studies |
C. | Speed and delay studies |
D. | Origin and destination studies |
Answer» B. Spot speed studies | |