| 1. |
Production planning in the intermediate range of time is termed as |
| A. | Production planning. |
| B. | Long range production planning. |
| C. | Scheduling. |
| D. | Aggregate planning. |
| Answer» E. | |
| 2. |
Out of the following factors that are affecting Capacity Planning, which one is LessControllable one? |
| A. | Machine break-downs |
| B. | Amount of labour employed |
| C. | Facilities installed |
| D. | Shifts of work per day |
| Answer» B. Amount of labour employed | |
| 3. |
One of the important basic objectives of Inventory management is: |
| A. | To calculate EOQ for all materials in the organisation |
| B. | To go in person to the market and purchase the materials |
| C. | To employ the available capital efficiently so as to yield maximum results |
| D. | Once materials are issued to the departments, personally check how they are used. |
| Answer» D. Once materials are issued to the departments, personally check how they are used. | |
| 4. |
For production planning: |
| A. | Short term forecasting is useful |
| B. | Medium term forecasting is useful |
| C. | Long term forecasting is useful |
| D. | Forecasting is not useful. |
| Answer» B. Medium term forecasting is useful | |
| 5. |
‘Z’ chart is a chart used in: |
| A. | Programme control |
| B. | Job control |
| C. | Cost control |
| D. | Quality control |
| Answer» B. Job control | |
| 6. |
Scheduling shows: |
| A. | Total cost of production |
| B. | Total material cost |
| C. | Which resource should do which job and when |
| D. | The flow line of materials |
| Answer» D. The flow line of materials | |
| 7. |
In Job production system, we need: |
| A. | More unskilled labours |
| B. | Skilled labours |
| C. | Semi-skilled labours |
| D. | Old people |
| Answer» C. Semi-skilled labours | |
| 8. |
The act of releasing the production documents to the production department isknown as: |
| A. | Planning |
| B. | Routing |
| C. | Dispatching |
| D. | Releasing |
| Answer» D. Releasing | |
| 9. |
Long range forecasting is useful in: |
| A. | Plan for Research and Development |
| B. | To Schedule jobs in Job production |
| C. | In purchasing the material to meet the present production demand |
| D. | To assess manpower required in the coming month. |
| Answer» B. To Schedule jobs in Job production | |
| 10. |
Production control concerned with: |
| A. | Passive assessment of plant performance |
| B. | Strict control on labours |
| C. | Good materials management |
| D. | Good product design |
| Answer» B. Strict control on labours | |
| 11. |
The effective capacity is NOT influenced by which of the following factors: |
| A. | Forecasts of demand |
| B. | Plant and labour efficiency |
| C. | Subcontracting |
| D. | None of the above |
| Answer» E. | |
| 12. |
Fixing Flow lines in production is known as : |
| A. | Scheduling |
| B. | Loading |
| C. | Planning |
| D. | Routing |
| Answer» E. | |
| 13. |
Which one of the following recent trends in Production/Operations management involves drastic measures or break through improvements to improve the performance of a firm? |
| A. | Corporate Downsizing |
| B. | Re-Engineering |
| C. | Technology |
| D. | TQM |
| Answer» C. Technology | |
| 14. |
The scope of Production Planning and Control is: |
| A. | Limited to Production of products only |
| B. | Limited to production of services only |
| C. | Limited to production of services and products only |
| D. | Unlimited, can be applied to any type of activity. |
| Answer» E. | |
| 15. |
Which of the following models deals with the physical movement of goods fromdifferent supply origins to a number of different demand destinations? |
| A. | Simulation |
| B. | Transportation |
| C. | Lean operations |
| D. | Line balancing |
| Answer» C. Lean operations | |
| 16. |
The recent trend in the Production/Operations management which suggests the use of minimal amount of resources to produce a high volume of high quality goods with some variety is referred to as: |
| A. | SCM |
| B. | TQM |
| C. | Lean Production |
| D. | Just-In-Time |
| Answer» D. Just-In-Time | |
| 17. |
Routing and Scheduling becomes relatively complicated in |
| A. | Job production |
| B. | Batch production |
| C. | Flow production |
| D. | Mass production |
| Answer» C. Flow production | |
| 18. |
Linear Programming is a technique used for determining: |
| A. | Production Programme |
| B. | Plant Layout |
| C. | Product Mix |
| D. | Manufacturing Sequence. |
| Answer» D. Manufacturing Sequence. | |
| 19. |
One of the requirements of Aggregate Planning is: |
| A. | Both output and sales should be expressed in a logical overall unit of measuring |
| B. | Appropriate time period |
| C. | List of all resources available |
| D. | List of operations required. |
| Answer» B. Appropriate time period | |
| 20. |
Preferred numbers are used to: |
| A. | To determine the number of varieties that are to be manufactured |
| B. | To the test the design of the product |
| C. | To ascertain the quality level of the product |
| D. | To evaluate the production cost. |
| Answer» B. To the test the design of the product | |
| 21. |
In solving a problem on LOB, the number of workstations required is given by: |
| A. | Cycle time/Total time |
| B. | Cycle time/Element time |
| C. | Total time/Element time |
| D. | Total time/ Cycle time. |
| Answer» E. | |
| 22. |
Application of technology or process to the raw material to add use value is knownas: |
| A. | Product |
| B. | Production |
| C. | Application of technology |
| D. | Combination of technology and process. |
| Answer» C. Application of technology | |
| 23. |
The activity of specifying when to start the job and when to end the job is known as: |
| A. | Planning |
| B. | Scheduling |
| C. | Timing |
| D. | Follow-up. |
| Answer» C. Timing | |
| 24. |
Generally in continuous production the production is carried out to: |
| A. | Customer’s order, |
| B. | Government orders only |
| C. | For stock and supply |
| D. | Few rich customers. |
| Answer» D. Few rich customers. | |
| 25. |
Preventive maintenance is useful in reducing |
| A. | Inspection Cost |
| B. | Cost of premature replacement |
| C. | Shutdown Cost |
| D. | Set-up Cost of machine |
| Answer» D. Set-up Cost of machine | |
| 26. |
Most important benefit to the consumer from efficient production system is: |
| A. | He can save money |
| B. | He will have product of his choice easily available |
| C. | He gets increased use value in the product |
| D. | He can get the product on credit. |
| Answer» D. He can get the product on credit. | |
| 27. |
Identify which one of the following statement is NOT correct? |
| A. | Preventing maintenance includes lubrication, cleaning, periodic overhaul, etc. |
| B. | The two types of cost-cost of premature replacement and cost of breakdownneed to be balanced. |
| C. | Wear and obsolescence are the two main causes of replacement of machinery in every aspect of life. |
| D. | A machine is technically obsolete when another machine can do the same job more efficiently with reduced time and also at a lower cost. |
| Answer» B. The two types of cost-cost of premature replacement and cost of breakdownneed to be balanced. | |
| 28. |
The starting point of Production cycle is: |
| A. | Product design |
| B. | Production Planning, |
| C. | Routing |
| D. | Market research. |
| Answer» E. | |
| 29. |
Which of the following is NOT the Plant Layout Principle? |
| A. | Principle of sequence |
| B. | Principle of usage |
| C. | Principle of maximum travel |
| D. | Principle of minimum investment |
| Answer» D. Principle of minimum investment | |
| 30. |
In Production by disintegration the material undergoes: |
| A. | Change in economic value only |
| B. | Change in physical and chemical characteristics |
| C. | Change in technology only |
| D. | None of the above. |
| Answer» C. Change in technology only | |
| 31. |
The cycle time, selected in balancing a line must be: |
| A. | Must be greater than the smallest time element given in the problem |
| B. | Must be less than the highest time element given in the problem |
| C. | Must be slightly greater than the highest time element given in the problem |
| D. | Left to the choice of the problem solver. |
| Answer» D. Left to the choice of the problem solver. | |
| 32. |
Issuing necessary orders, and taking necessary steps to ensure that the time targetsset in the schedules are effectively achieved is known as: |
| A. | Routing |
| B. | Dispatching |
| C. | Scheduling |
| D. | Inspection. |
| Answer» C. Scheduling | |
| 33. |
Which one of the following standards is associated with the "Quality Assurance inProduction and Installation"? |
| A. | ISO 9001 |
| B. | ISO 9002 |
| C. | ISO 9003 |
| D. | ISO 9004 |
| Answer» C. ISO 9003 | |
| 34. |
The time horizon selected for forecasting depends on: |
| A. | The salability of the product |
| B. | The selling capacity of Salesman |
| C. | Purpose for which forecast is made |
| D. | Time required for production cycle |
| Answer» D. Time required for production cycle | |
| 35. |
The lead-time is the time: |
| A. | To place holders for materials |
| B. | Time of receiving materials |
| C. | Time between receipt of material and using materials, |
| D. | Time between placing the order and receiving the materials |
| Answer» E. | |
| 36. |
The most powerful and popular method for solving linear programming problem is |
| A. | Simplex method |
| B. | Graphical method |
| C. | Transportation method |
| D. | Assignment method |
| Answer» B. Graphical method | |
| 37. |
Key aspects in process strategy does NOT include which of the following: |
| A. | Make or buy decisions |
| B. | Capital intensity |
| C. | Process flexibility |
| D. | Packaging |
| Answer» E. | |
| 38. |
In a network diagram, the activity that must be completed prior to the start of anactivity is called as |
| A. | Successor activity |
| B. | Predecessor activity |
| C. | Concurrent activity |
| D. | Dummy activity |
| Answer» C. Concurrent activity | |
| 39. |
Which one of the following standards is associated with the “Quality Managementand Quality System Elements-Guidelines”? |
| A. | ISO 9001 |
| B. | ISO 9002 |
| C. | ISO 9003 |
| D. | ISO 9004 |
| Answer» E. | |
| 40. |
The best way of improving the productivity of capital is: |
| A. | Purchase automatic machines |
| B. | Effective Labour control |
| C. | To use good financial management |
| D. | Productivity of capital is to be increased through effective materials management. |
| Answer» E. | |
| 41. |
The act of assessing the future and make provisions for it is known as |
| A. | Planning |
| B. | Forecasting |
| C. | Assessment |
| D. | Scheduling. |
| Answer» C. Assessment | |
| 42. |
One of the important charts used in programme control is: |
| A. | Material chart |
| B. | Gantt chart |
| C. | Route chart |
| D. | Inspection chart |
| Answer» C. Route chart | |
| 43. |
Most suitable layout for Continuous production is: |
| A. | Line layout |
| B. | Process Layout |
| C. | Group technology |
| D. | Matrix layout. |
| Answer» B. Process Layout | |
| 44. |
Most suitable layout for Job production is: |
| A. | Line layout |
| B. | Matrix layout |
| C. | Process layout |
| D. | Product layout. |
| Answer» D. Product layout. | |
| 45. |
One of the principles of Scheduling is: |
| A. | Principle of optimal product design |
| B. | Principle of selection of best material |
| C. | Principle of optimal operation sequence |
| D. | Principle of optimal cost. |
| Answer» D. Principle of optimal cost. | |
| 46. |
Production planning deals with: |
| A. | What production facilities is required and how these facilities should be laid out in space available |
| B. | What to produce and when to produce and where to sell |
| C. | What should be the demand for the product in future? |
| D. | What is the life of the product? |
| Answer» B. What to produce and when to produce and where to sell | |
| 47. |
The quantities for which the planner has to prepare production plan are known as: |
| A. | Optimal quantity of products |
| B. | Material planning |
| C. | Quantity planning |
| D. | Planning quantity standards. |
| Answer» E. | |
| 48. |
The first stage of Production control is: |
| A. | Dispatching |
| B. | Scheduling |
| C. | Routing |
| D. | Triggering of production operations and observing the progress and record the |
| Answer» E. | |
| 49. |
The example of worker involvement, as a recent trend in production/operationsmanagement is |
| A. | SCM |
| B. | Just-in-Time |
| C. | Quality Circle |
| D. | MRP |
| Answer» D. MRP | |
| 50. |
Medium range forecasting is useful in: |
| A. | To assess the loading capacity of the machine |
| B. | To purchase a materials for next month |
| C. | To plan for-capacity adjustments |
| D. | To decide whether to receive production orders or not. |
| Answer» D. To decide whether to receive production orders or not. | |