1.

The highest point provided on the pavement is ___________

A. Crown
B. Camber
C. Cross slope
D. Drainage
Answer» B. Camber
2.

The structure provided on the pavement to remove the storm water is ___________

A. Drainage
B. Camber
C. Crown
D. Curves
Answer» C. Crown
3.

The water that cannot be drained of by gravity is called ___________

A. Pore water
B. Held water
C. Gravitational water
D. Capillary water
Answer» D. Capillary water
4.

The seepage flow is present in ___________

A. Surface drainage
B. Sub surface drainage
C. Camber
D. Cross slope
Answer» C. Camber
5.

The surface drainage doesn t consist of ___________

A. Camber
B. Road side drains
C. Culverts
D. Curves
Answer» E.
6.

The removal and diversion of surface water from the roadway is called ___________

A. Surface drainage
B. Sub surface drainage
C. Camber
D. Cross slope
Answer» B. Sub surface drainage
7.

The surface water is obtained from ___________

A. Ground water
B. Rainfall
C. Leakage of water from water treatment plants
D. None of the mentioned
Answer» C. Leakage of water from water treatment plants
8.

The number of important factors for highway engineer are ___________

A. One
B. Two
C. Three
D. Four
Answer» D. Four
9.

The process of removing and controlling excess surface and sub soil water within roadway is ___________

A. Highway Engineering
B. Highway maintenance
C. Highway drainage
D. Highway finance
Answer» D. Highway finance