1. |
The highest point provided on the pavement is ___________ |
A. | Crown |
B. | Camber |
C. | Cross slope |
D. | Drainage |
Answer» B. Camber | |
2. |
The structure provided on the pavement to remove the storm water is ___________ |
A. | Drainage |
B. | Camber |
C. | Crown |
D. | Curves |
Answer» C. Crown | |
3. |
The water that cannot be drained of by gravity is called ___________ |
A. | Pore water |
B. | Held water |
C. | Gravitational water |
D. | Capillary water |
Answer» D. Capillary water | |
4. |
The seepage flow is present in ___________ |
A. | Surface drainage |
B. | Sub surface drainage |
C. | Camber |
D. | Cross slope |
Answer» C. Camber | |
5. |
The surface drainage doesn t consist of ___________ |
A. | Camber |
B. | Road side drains |
C. | Culverts |
D. | Curves |
Answer» E. | |
6. |
The removal and diversion of surface water from the roadway is called ___________ |
A. | Surface drainage |
B. | Sub surface drainage |
C. | Camber |
D. | Cross slope |
Answer» B. Sub surface drainage | |
7. |
The surface water is obtained from ___________ |
A. | Ground water |
B. | Rainfall |
C. | Leakage of water from water treatment plants |
D. | None of the mentioned |
Answer» C. Leakage of water from water treatment plants | |
8. |
The number of important factors for highway engineer are ___________ |
A. | One |
B. | Two |
C. | Three |
D. | Four |
Answer» D. Four | |
9. |
The process of removing and controlling excess surface and sub soil water within roadway is ___________ |
A. | Highway Engineering |
B. | Highway maintenance |
C. | Highway drainage |
D. | Highway finance |
Answer» D. Highway finance | |