

MCQOPTIONS
Saved Bookmarks
This section includes 10 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
The miscellaneous road factor for maintenance is __________ |
A. | Surface of pavement |
B. | Shoulder |
C. | Kerbs and median |
D. | Geometric design |
Answer» D. Geometric design | |
2. |
The measure not adopted to take care of the embankment failure is __________ |
A. | Benching |
B. | Grass turf |
C. | Stone pitching |
D. | Rise of embankment above HFL |
Answer» E. | |
3. |
The slopes and edges of road embankment get eroded leading to the formation of __________ |
A. | Ruts |
B. | Cuts |
C. | Pot holes |
D. | Cracks |
Answer» B. Cuts | |
4. |
The culvert is a structure whose span is less than __________ |
A. | 15m |
B. | 60m |
C. | 7m |
D. | 6m |
Answer» E. | |
5. |
The longitudinal slope erosion can be corrected by __________ |
A. | Compaction |
B. | Consolidated soil |
C. | Permeability |
D. | Void ratio |
Answer» B. Consolidated soil | |
6. |
The soil erosion may take place on roadside drains where the longitudinal slope is? |
A. | Very steep |
B. | Steep |
C. | Normal |
D. | Not steep |
Answer» C. Normal | |
7. |
On roads where the soil has been deposited should be stripped by __________ |
A. | Trowel |
B. | Vicat apparatus |
C. | Blade grader |
D. | Bulldozer |
Answer» D. Bulldozer | |
8. |
The desired cross slope in embankment is __________ |
A. | 1% |
B. | 2% |
C. | 3% |
D. | 4% |
Answer» E. | |
9. |
The maintenance of rigid pavement is __________ |
A. | Easy |
B. | Difficult |
C. | Very difficult |
D. | Neutral |
Answer» B. Difficult | |
10. |
The maintenance works are not possible for __________ |
A. | Shoulder |
B. | Pavement |
C. | Embankment |
D. | Sub grade |
Answer» E. | |