1.

The unit of payment of cement concrete in lintels is _________

A. Per sqm
B. Per cum
C. Quintal
D. Kilograms
Answer» C. Quintal
2.

Calculate the number of cement bags required for RCC (1:2:4) for 15 m3 of work.

A. 24.6
B. 38.9
C. 56.7
D. 93.8
Answer» E.
3.

The quantity of coarse aggregate required for RCC (1:3:6) for 20 cubic metres of work is ________

A. 18.24 m3
B. 15.23 m3
C. 24.87 m3
D. 32.45 m3
Answer» B. 15.23 m3
4.

The quantity of sand required for RCC (1:2:4) for 15 cubic metres of work is ___________

A. 4.76 m3
B. 10.32 m3
C. 8.43 m3
D. 6.51 m3
Answer» E.
5.

Calculate the number of cement bags required for 2500 kg of cement.

A. 50
B. 100
C. 500
D. 200
Answer» B. 100
6.

The rates of materials used for government works are approved by _________

A. Executive Board
B. SDO
C. Elective Board
D. Board of Chief Engineers
Answer» E.
7.

The concrete used for cement concrete roads is of grade ___________

A. M 10
B. M 15
C. M 20
D. M 35
Answer» C. M 20