1.

As per the rules for measurement of items, it is specified that the areas should be measured to the nearest ________

A. 0.1 sq m
B. 0.25 sq m
C. 0.01 sq m
D. 0.85 sq m
Answer» D. 0.85 sq m
2.

The rules for measurement of all items are described in _______

A. IS-1993
B. IS-1896
C. IS-1200
D. IS-1987
Answer» D. IS-1987
3.

The unit of measurement of pointing, painting and varnishing (no. of coats specified) is cum.

A. True
B. False
C.
Answer» C.
4.

Unit of measurement of rainwater pipe is ________

A. Cum
B. Litres
C. Number
D. Running metres
Answer» E.
5.

Unit of measurement of asbestos cement sheet roofing is __________

A. Sqm
B. Kilograms
C. Metres
D. Number
Answer» B. Kilograms
6.

Unit of measurement of iron holdfasts in steelwork is ___________

A. Sqm
B. Number
C. Metres
D. Quintal
Answer» E.
7.

Unit of measurement for damp proof course is ____________

A. Sqm
B. Cum
C. Number
D. Kg
Answer» B. Cum
8.

Works like earthwork and cement concrete are measured in ________

A. Square metres
B. Metres
C. Litres
D. Cubic metres
Answer» E.
9.

Works like whitewashing and plastering are measured in ________

A. m2
B. Metres
C. Litres
D. m3
Answer» B. Metres
10.

Work consisting of linear measurements like fencing which involve lengths is measured in __________

A. Kilograms
B. Running metres
C. m2
D. m3
Answer» C. m2
11.

Single units work such as doors and windows are expressed in ________

A. numbers
B. metres
C. m2
D. m3
Answer» B. metres