Explore topic-wise MCQs in Mechanical Engineering.

This section includes 583 Mcqs, each offering curated multiple-choice questions to sharpen your Mechanical Engineering knowledge and support exam preparation. Choose a topic below to get started.

401.

*/*_In perpetual inventory control, the material is checked as it reaches its?

A. Minimum value
B. Maximum value
C. Average value
D. Middle value
Answer» B. Maximum value
402.

*/*_Which of the following type of layout is suitable for automobile manufacturing concern??

A. Product layout
B. Process layout
C. Fixed position layout
D. Combination layout
Answer» B. Process layout
403.

*/*_Earliest finish time can be regarded as?

A. Earliest start time + duration of activity
B. Earliest start time duration of activity
C. Latest finish time + duration of activity
D. Latest finish time duration of activity
Answer» B. Earliest start time duration of activity
404.

*/*_Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer??

A. Emerson efficiency plan
B. Taylor plan
C. Halsey premium plan
D. Gilbert plan
Answer» D. Gilbert plan
405.

*/*_Frederick W. Taylor introduced a system of working known as?

A. Line organisation
B. Line and staff organisation
C. Functional organisation
D. Effective organisation
Answer» D. Effective organisation
406.

%_CPM stands for_%

A. Combined Process Method
B. Critical Path Method
C. Common Planning Method
D. Critical Process Method
Answer» C. Common Planning Method
407.

%_TMU in method time measurement stands for_%

A. Time motion unit
B. Time measurement unit
C. Time movement unit
D. Technique measurement unit
Answer» C. Time movement unit
408.

%_Scheduling_%

A. Prescribes the sequence of operations to be followed
B. Determines the programme for the operations
C. Is concerned with starting of processes
D. Regulates the progress of job through various processes
Answer» C. Is concerned with starting of processes
409.

%_Work study is mainly aimed at_%

A. Determining the most efficient method of performing a job
B. Establishing the minimum time of completion of a job
C. Developing the standard method and standard time of a job
D. Economizing the motions involved on the part of the worker while performing a job
Answer» B. Establishing the minimum time of completion of a job
410.

%_PERT is applied for_%

A. Marketing programmes and advertising programmes
B. Installation of machinery
C. Research and development of products
D. All of these
Answer» E.
411.

%_Pick up the correct statement from the following_%

A. If the float is positive and the activity is delayed by a period equal to its total float, the completion of project in not delayed
B. If the float of an activity is negative, delay in its performance is bound to delay the completion of project
C. If the float of an activity is zero, the activity is critical and any delay in its performance will delay the whole project
D. All of the above
Answer» E.
412.

%_The start or completion of task is called_%

A. An event
B. An activity
C. A duration
D. None of these
Answer» B. An activity
413.

%_PERT and CPM are_%

A. Techniques to determine project status
B. Decision making techniques
C. Charts which increase aesthetic appearance of rooms
D. Aids to the decision maker
Answer» E.
414.

%_Which of the following type of layout is suitable for automobile manufacturing concern?_%

A. Product layout
B. Process layout
C. Fixed position layout
D. Combination layout
Answer» B. Process layout
415.

%_Frederick W. Taylor introduced a system of working known as_%

A. Line organisation
B. Line and staff organisation
C. Functional organisation
D. Effective organisation
Answer» D. Effective organisation
416.

%_In perpetual inventory control, the material is checked as it reaches its_%

A. Minimum value
B. Maximum value
C. Average value
D. Middle value
Answer» B. Maximum value
417.

%_Earliest finish time can be regarded as_%

A. Earliest start time + duration of activity
B. Earliest start time duration of activity
C. Latest finish time + duration of activity
D. Latest finish time duration of activity
Answer» B. Earliest start time duration of activity
418.

%_Which of the following incentive plans ensures a part of the swing to the worker and rest to the employer?_%

A. Emerson efficiency plan
B. Taylor plan
C. Halsey premium plan
D. Gilbert plan
Answer» D. Gilbert plan
419.

_ Merit rating is the method of determining the$?

A. Relative values of a job
B. Workers performance on a job
C. Worth of a machine
D. Value of overall production
Answer» C. Worth of a machine
420.

_ The average time recorded by work study man for an operation is called$?

A. Standard time
B. Normal time
C. Representative time
D. None of these
Answer» D. None of these
421.

_ Pick up the correct statement about relationship between various floats$?

A. Free float = total float
B. Independent float = total float
C. Independent float > free float
D. Independent float < free float
Answer» E.
422.

_ Travel charts are used to$?

A. Analyze material handling
B. Determine inventory control difficulties
C. Plan material handling procedure and routes
D. All of the above
Answer» E.
423.

_ Work study comprises following main techniques$?

A. Method study and work measurement
B. Method study and time study
C. Time study and work measurement
D. Method study and job evaluation
Answer» B. Method study and time study
424.

_ Which of the following layouts is suited to job production?$?

A. Process layout
B. Product layout
C. Fixed position layout
D. Plant layout
Answer» B. Product layout
425.

_ The appellate authority for an industrial dispute is$?

A. Management
B. Labour court
C. High court/supreme court
D. Board of directors
Answer» D. Board of directors
426.

_ Performance rating is equal to$?

A. Observed performance + normal performance
B. Observed performance - normal performance
C. Observed performance √ó normal performance
D. None of the above
Answer» E.
427.

_ Inventory management consists of$?

A. Effective running of stores
B. State of merchandise methods of storing and maintenance etc.
C. Stock control system
D. All of the above
Answer» E.
428.

_ A systematic job improvement sequence will consist of$?

A. Motion study
B. Time study
C. Job enrichment
D. All of these
Answer» E.
429.

_ Work study is most useful$?

A. Where production activities are involved
B. In judging the rating of machines
C. In improving industrial relations
D. In judging the output of a man and improving it
Answer» B. In judging the rating of machines
430.

_ Which of the following wage incentive plan is applied to all workers?$?

A. Halsey plan
B. Gantt plan
C. Emerson's efficiency plan
D. Rowan plan
Answer» B. Gantt plan
431.

_ CPM stands for$?

A. Combined Process Method
B. Critical Path Method
C. Common Planning Method
D. Critical Process Method
Answer» C. Common Planning Method
432.

_ Routing assists engineers in deciding in advance$?

A. The flow of material in the plant
B. The methods of proper utilization of manpower
C. The methods of proper utilization of machines
D. The layout of factory facilities
Answer» D. The layout of factory facilities
433.

_ The type of organisation preferred for an automobile industry, is$?

A. Line organisation
B. Functional organisation
C. Line and staff organisation
D. Line, staff and functional organisation
Answer» D. Line, staff and functional organisation
434.

_ Product layout is used for$?

A. Job production
B. Batch production
C. Mass production
D. Any one of these
Answer» D. Any one of these
435.

_ P.M.T.S. (Predetermined Motion Time Systems) include$?

A. M.T.M. (Method Time Measurement)
B. W.F.S. (Work Factor Systems)
C. B.M.T.S. (Basic Motion Time Study)
D. All of these
Answer» E.
436.

_ Pick up the incorrect statement from the following. A critical ratio scheduling$?

A. Establishes the relative priorities among various activities on a common basis
B. Determines the status of each activity
C. Adjusts automatically changes in activity progress
D. None of the above
Answer» E.
437.

_ Basic tool in work study is$?

A. Graph paper
B. Process chart
C. Planning chart
D. Stop watch
Answer» E.
438.

_ In Emerson's efficiency plan of wage incentive system, bonus is paid to a worker$?

A. Whose output exceeds 67% efficiency
B. On the percentage of time saved
C. On the percentage of time worked
D. On the percentage of standard time
Answer» B. On the percentage of time saved
439.

_ Which of the following statement is correct about the network diagram?$?

A. The events are represented graphically by circles or nodes at the beginning and the end of activity by arrows.
B. The tail end of the arrow represents the start of an activity.
C. The head of the arrow represents the end of an activity.
D. All of the above
Answer» E.
440.

_ The important file in making a PERT is$?

A. An event can't be accomplished until activities leading to it are completed
B. No activity from any event can be started from preceding event till it is completed
C. Length of arrow has nothing to do with time
D. All of the above
Answer» E.
441.

_ The employees provident fund act is applicable to$?

A. All industries
B. All industries other than small and medium industries
C. Volunteers
D. The industries notified by Government
Answer» E.
442.

_ Motion study involves analysis of$?

A. Actions of operator
B. Layout of work place
C. Tooling and equipment
D. All of the above
Answer» B. Layout of work place
443.

_ In a functional organisation$?

A. Quality of work is better
B. Wastage of material is minimum
C. Specialized knowledge and guidance to individual worker is provided
D. All of the above
Answer» E.
444.

_ The purpose of micro-motion study is to$?

A. Assist in finding out the most efficient way of doing work
B. Train the individual operator regarding the motion economy principles
C. Help in collecting the motion time data for synthetic time standards
D. All of the above
Answer» E.
445.

_ PERT and CPM are$?

A. Techniques to determine project status
B. Decision making techniques
C. Charts which increase aesthetic appearance of rooms
D. Aids to the decision maker
Answer» E.
446.

_ The factors which are to be considered while developing a good wage incentive plan will include$?

A. Adequate incentive
B. Ease of administration
C. Guaranteed basic pay
D. All of these
Answer» E.
447.

_ Pick up the correct step used for scheduling a project by C.P.M.$?

A. A project is divided into various activities
B. Required time for each activity is established
C. Sequence of various activities is made according to their importance
D. All of the above
Answer» E.
448.

_ If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Halsey 50-50 plan, wages for the job will be$?

A. TR
B. TR + [(S - T)/2] √ó R
C. TR + (S - T) √ó R
D. TR + [(S - T)/S] √ó R
Answer» C. TR + (S - T) ‚àö√≥ R
449.

_ Bar charts are suitable for$?

A. Minor works
B. Major works
C. Large projects
D. All of the above
Answer» B. Major works
450.

__Standard time as compared to normal time is__

A. Greater
B. Smaller
C. Equal
D. There is no such correlation
Answer» B. Smaller