Explore topic-wise MCQs in Mechanical Engineering.

This section includes 583 Mcqs, each offering curated multiple-choice questions to sharpen your Mechanical Engineering knowledge and support exam preparation. Choose a topic below to get started.

351.

The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as%!

A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Rowan Plan
Answer» E.
352.

Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant%!

A. Sinking fund method
B. Straight line method
C. ABC charging method
D. Annuity charging method
Answer» E.
353.

PMTP (predetermined motion time systems) include%!

A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. All of the above
Answer» E.
354.

The work study is done by means of%!

A. Planning chart
B. Process chart
C. Stop watch
D. Any one of these
Answer» D. Any one of these
355.

*$_Slack represents the difference between the?

A. Latest allowable time and the normal expected time
B. Latest allowable time and the earliest expected time
C. Proposed allowable time and the earliest expected time
D. Normal allowable time and the latest expected time
Answer» C. Proposed allowable time and the earliest expected time
356.

*$_'Value' for value engineering and analysis purposes is defined as?

A. Purchase value
B. Saleable value
C. Depreciated value
D. Function/cost
Answer» E.
357.

*$_A company spends considerable amount on publicity to promote sales. This expenditure in break even chart is shown below the?

A. Fixed cost line
B. Variable cost line
C. Total cost line
D. Sales revenue line
Answer» C. Total cost line
358.

*$_Discrepancies of bar chart techniques are?

A. Consequential effects of lack in one activity on the finish date
B. Free time available for an activity can't be predicted
C. Effective monitoring/controlling can't be done
D. All of the above
Answer» E.
359.

*$_The process capability of a machine is defined as the capability of the machine to?

A. Produces a definite volume of work per minute
B. Perform definite number of operations
C. Produce job at a definite spectrum of speed
D. Holds a definite spectrum of tolerance and surface finish
Answer» B. Perform definite number of operations
360.

*$_Father of industrial engineering is?

A. Jack Gilbert
B. Gantt
C. Taylor
D. Newton
Answer» C. Taylor
361.

*$_For handling materials during manufacture of cement, a _________ is widely used.?

A. Belt conveyor
B. Bucket conveyor
C. Fork lift truck
D. Overhead crane
Answer» C. Fork lift truck
362.

*$_Service time in queuing theory is usually assumed to follow?

A. Normal distribution
B. Poisson’s distribution
C. Erlang distribution
D. Exponential law
Answer» E.
363.

*$_The mathematical technique for finding the best use of limited resources in an optimum manner is known as?

A. Operation research
B. Linear programming
C. Network analysis
D. Break-even analysis
Answer» C. Network analysis
364.

*$_Routing is essential in the following type of industry?

A. Assembly industry
B. Process industry
C. Job order industry
D. Mass production industry
Answer» B. Process industry
365.

*/*_Which of the following is independent of sales forecast??

A. Productivity
B. Inventory control
C. Production planning
D. Production control
Answer» B. Inventory control
366.

*/*_Merit Rating is the method of determining worth of?

A. A job
B. An individual employee
C. A particular division in workshop
D. Machine
Answer» C. A particular division in workshop
367.

*/*_The aim of value engineering is to?

A. Find the depreciation value of a machine
B. Determine the selling price of a product
C. Minimize the cost without change in quality of the product
D. All of the above
Answer» D. All of the above
368.

*/*_The product layout?

A. Lowers overall manufacturing time
B. Requires less space for placing machines
C. Utilizes machine and labour better
D. All of these
Answer» E.
369.

*/*_The main advantage of line organisation is its?

A. Effective command and control
B. Defined responsibilities at all levels
C. Rigid discipline in the organisation
D. All of the above
Answer» E.
370.

*/*_Micro motion study is?

A. Analysis of a man-work method by using a motion picture camera with a timing device in the field of view
B. Motion study observed on enhanced time intervals
C. Motion study of a sequence of operations conducted systematically
D. Study of man and machine conducted simultaneously
Answer» B. Motion study observed on enhanced time intervals
371.

*/*_Choose the wrong statement. Motion study is used for?

A. Improving a work method
B. Improvising a work method
C. Designing a work method
D. Reducing inventory costs
Answer» E.
372.

*/*_In value engineering, important consideration is given to?

A. Customer satisfaction
B. Function concept
C. Profit maximization
D. Cost reduction
Answer» E.
373.

*/*_The wastage of material in the store is taken into account by the following method in the evaluation of the material issued from the store?

A. Inflated system
B. Primary cost method
C. Current value method
D. Fixed price method
Answer» B. Primary cost method
374.

*/*_In the cost structure of a product, the selling price is determined by the factors such as?

A. Sales turn over
B. Lowest competitive price
C. Various elements of the cost
D. All of the above
Answer» E.
375.

*/*_In which of the following layouts, the lines need to the balanced?

A. Process layout
B. Product layout
C. Fixed position layout
D. Plant layout
Answer» C. Fixed position layout
376.

*/*_Inventory control in production, planning and control aims at?

A. Achieving optimization
B. Ensuring against market fluctuations
C. Acceptable customer service at low capital investment in inventory
D. Discounts allowed in bulk purchase
Answer» D. Discounts allowed in bulk purchase
377.

*/*_The objective of time study is to determine the time required to complete a job by?

A. Fast worker
B. Average worker
C. Slow worker
D. New entrant
Answer» C. Slow worker
378.

*/*_At the break-even point,?

A. Total cost is more than the sales revenue
B. Total cost is less than the sales revenue
C. Total cost is equal to sales revenue
D. Fixed cost is equal to variable cost
Answer» D. Fixed cost is equal to variable cost
379.

*/*_The unit cost in case of batch production is __________as compared to jobbing production.?

A. Same
B. Low
C. High
D. None of these
Answer» C. High
380.

*/*_PMTP (predetermined motion time systems) include?

A. MTM (method time measurement)
B. WFS (work factor systems)
C. BNTS (basic motion time study)
D. All of the above
Answer» E.
381.

*/*_Which of the following depreciation system ensures that the interest be charged on the cost of machine asset every year on the book value, but the rate of depreciation every year remains constant?

A. Sinking fund method
B. Straight line method
C. ABC charging method
D. Annuity charging method
Answer» E.
382.

*/*_The most suitable incentive plan for the maintenance section of an industry will be?

A. Piece rate system
B. Group incentive plan
C. Profit sharing plans
D. Simplification
Answer» C. Profit sharing plans
383.

*/*_The work study is done by means of?

A. Planning chart
B. Process chart
C. Stop watch
D. Any one of these
Answer» D. Any one of these
384.

*/*_The time required to complete a job is established and a bonus is paid to the worker based on the exact % of time saved. This type of incentive plan is known as?

A. Dry work Plan
B. Halsey Premium Plan
C. Taylor Plan
D. Rowan Plan
Answer» E.
385.

*/*_Valve analysis is particularly of interest when?

A. Jobbing work economics are involved
B. Production is on large scale
C. Only few components are involved
D. Costly equipment is used
Answer» C. Only few components are involved
386.

*/*_Which of the following layouts is suited for mass production??

A. Process layout
B. Product layout
C. Fixed position layout
D. Plant layout
Answer» C. Fixed position layout
387.

*/*_In CPM, the cost slope is determined by?

A. Crash cost/Normal Cost
B. (Crash Cost - Normal cost)/ (Normal time - Crash time)
C. Normal Cost/Crash cost
D. (Normal cost - Crash cost)/ (Normal time - Crash time)
Answer» C. Normal Cost/Crash cost
388.

*/*_Which of the following organisation is preferred in automobile industry??

A. Functional organisation
B. Line organisation
C. Staff organisation
D. Line and staff organizations
Answer» E.
389.

*/*_For material transportation, conveyors are used when the prevailing conditions include?

A. Loads are uniform
B. Routes do not vary
C. Materials move relatively continuously
D. All of these
Answer» E.
390.

*/*_Which one of the following represents a group incentive plan??

A. Scanlon Plan
B. Rowan Plan
C. Taylor Differential Piece Rate System
D. Halsey Premium Plan
Answer» B. Rowan Plan
391.

*/*_PERT is?

A. An analytic tool in concept
B. Limit up of event oriented diagrams
C. Used for research and development projects
D. All of the above
Answer» E.
392.

*/*_In the Halsey system of wage incentive plan, a worker is?

A. Paid as per efficiency
B. Ensured of minimum wages
C. Not paid any bonus till his efficiency
D. Never a loser
Answer» C. Not paid any bonus till his efficiency
393.

*/*_The amount deducted from the salary of workers towards employee’s provident fund is?

A. Credited into reserves of company
B. Deposited in nationalized bank
C. Deposited in post office
D. Deposited in the account of worker with Provident Fund Commissioner
Answer» E.
394.

*/*_If (R) is the base rate guaranteed per hour, (S) is the standard time for the job and (T) is the actual time, then according to Rowan plan, wages for the job will be?

A. TR
B. TR + [(S - T)/2] √ó R
C. TR + (S - T) √ó R
D. TR + [(S - T)/S] √ó R
Answer» E.
395.

*/*_The simplex method is the basic method for?

A. Value analysis
B. Operation research
C. Linear programming
D. Model analysis
Answer» D. Model analysis
396.

*/*_The correct sequence of phases in value engineering is?

A. Creative phase, information phase, investigation phase, evaluation phase
B. Information phase, creative phase, investigation phase, evaluation phase
C. Investigation phase, information phase, creative phase, evaluation phase
D. Creative phase, investigation phase, evaluation phase, information phase
Answer» B. Information phase, creative phase, investigation phase, evaluation phase
397.

*/*_PERT/CPM, techniques can be used for following applications?

A. Once through project
B. Maintenance jobs
C. Research and development
D. All of the above
Answer» E.
398.

*/*_The type of organisation preferred for a steel industry, is?

A. Line organisation
B. Functional organisation
C. Line and staff organisation
D. Line, staff and functional organisation
Answer» E.
399.

*/*_The standard time for a job is?

A. Total work content
B. Base time + relaxation time
C. Total work content + basic time
D. Total work content + delay contingency allowance
Answer» E.
400.

*/*_Bar chart is suitable for?

A. Large project
B. Major work
C. Minor work
D. All of these
Answer» D. All of these