1. |
The compaction of sand is done by __________ |
A. | Rollers |
B. | Animals |
C. | Vibrator |
D. | Jetting |
Answer» E. | |
2. |
The equipment having a bucket is? |
A. | Shovel |
B. | Clam shell |
C. | Dragline |
D. | Hoe |
Answer» C. Dragline | |
3. |
The stiff materials can be excavated by __________ |
A. | Dragline |
B. | Hoe |
C. | Power shovel |
D. | Scrapper |
Answer» C. Power shovel | |
4. |
Dragline cannot excavate __________ |
A. | Soft rocks |
B. | Black cotton soil |
C. | Clay |
D. | Stiff material |
Answer» E. | |
5. |
The boom is supported by __________ |
A. | Cab |
B. | Dipper stick |
C. | Hoist line |
D. | Crawler |
Answer» D. Crawler | |
6. |
The precise control of excavation is possible by __________ |
A. | Scrapper |
B. | Hoe |
C. | Shovel |
D. | Bulldozer |
Answer» B. Hoe | |
7. |
The blade angle of bulldozer is usually __________ |
A. | 60 |
B. | 90 |
C. | 15 |
D. | 45 |
Answer» C. 15 | |
8. |
What is the equipment used for short haul distance of 100 m? |
A. | Bulldozer |
B. | Scrapper |
C. | Power shovel |
D. | Hoe |
Answer» B. Scrapper | |
9. |
The best time to remove soil is during __________ |
A. | Summer |
B. | Winter |
C. | Rainy season |
D. | During storm |
Answer» B. Winter | |
10. |
The removal of earth for highway formation is __________ |
A. | Embankment |
B. | Sub grade |
C. | Excavation |
D. | Filling |
Answer» D. Filling | |
11. |
THE_EQUIPMENT_HAVING_A_BUCKET_IS?$ |
A. | Shovel |
B. | Clam shell |
C. | Dragline |
D. | Hoe |
Answer» C. Dragline | |
12. |
The compaction of sand is done by$ |
A. | Rollers |
B. | Animals |
C. | Vibrator |
D. | Jetting |
Answer» E. | |
13. |
The stiff materials can be excavated b? |
A. | Dragline |
B. | Hoe |
C. | Power shovel |
D. | Scrapper |
Answer» C. Power shovel | |
14. |
Dragline cannot excavate |
A. | Soft rocks |
B. | Black cotton soil |
C. | Clay |
D. | Stiff material |
Answer» E. | |
15. |
The boom is supported by |
A. | Cab |
B. | Dipper stick |
C. | Hoist line |
D. | Crawler |
Answer» D. Crawler | |
16. |
The precise control of excavation is possible by |
A. | Scrapper |
B. | Hoe |
C. | Shovel |
D. | Bulldozer |
Answer» B. Hoe | |
17. |
The blade angle of bulldozer is usually |
A. | 60 |
B. | 90 |
C. | 15 |
D. | 45 |
Answer» C. 15 | |
18. |
The equipment used for short haul distance of 100 m is |
A. | Bulldozer |
B. | Scrapper |
C. | Power shovel |
D. | Hoe |
Answer» B. Scrapper | |
19. |
The best time to remove soil is during |
A. | Summer |
B. | Winter |
C. | Rainy season |
D. | During storm |
Answer» B. Winter | |
20. |
The removal of earth for highway formation is |
A. | Embankment |
B. | Sub grade |
C. | Excavation |
D. | Filling |
Answer» B. Sub grade | |