MCQOPTIONS
Saved Bookmarks
This section includes 6 Mcqs, each offering curated multiple-choice questions to sharpen your Highway Engineering knowledge and support exam preparation. Choose a topic below to get started.
1. |
Highway should be planned for __________ |
A. | Present requirements |
B. | Traffic developments |
C. | Traffic studies |
D. | Present requirements and future requirements |
Answer» E. | |
2. |
The planning, design and construction of either a network of new roads or road link is called __________ |
A. | Highway project |
B. | Highway estimate |
C. | Highway interlinking |
D. | Highway design |
Answer» B. Highway estimate | |
3. |
The report that includes all the works including soil, bridges, topography, material studies and drainage studies is called as __________ |
A. | Feasibility report |
B. | Detailed project report |
C. | Survey report |
D. | Primary report |
Answer» C. Survey report | |
4. |
The approximate cost of construction evaluated for the project is called __________ |
A. | Project report |
B. | Project feasibility |
C. | Estimate |
D. | Detailed project report |
Answer» D. Detailed project report | |
5. |
The cross sections should be drawn for every __________ |
A. | 10m |
B. | 20m |
C. | 50m |
D. | 100m |
Answer» E. | |
6. |
The index map shows __________ |
A. | Topography |
B. | Soil |
C. | Area of the site |
D. | Plan |
Answer» B. Soil | |