MCQOPTIONS
Saved Bookmarks
| 1. |
Which of these should be carried out if the process is in-control and capable? |
| A. | SPC only |
| B. | Experimental design |
| C. | Change process |
| D. | Investigate specifications |
| Answer» B. Experimental design | |