This section includes 13 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
| 1. |
TOLLGATE_REVIEWS_ARE_DONE________?$ |
| A. | Before each step of DMAIC |
| B. | After DMAIC process ending |
| C. | Before the whole DMAIC process |
| D. | After each step of DMAIC process |
| Answer» E. | |
| 2. |
DFSS_REFERS_TO______?$ |
| A. | Development of Six-Sigma |
| B. | Design for Six-Sigma |
| C. | Define for Six-Sigma |
| D. | Development for Six-Sigma |
| Answer» C. Define for Six-Sigma | |
| 3. |
A DMAIC process is implemented on a process only when ______$ |
| A. | There are signs of potential breakthrough |
| B. | It is estimated that quality of products will decrease in near future. |
| C. | Exceptionally bad quality review of a product |
| D. | When the project impact of DMAIC is estimated low |
| Answer» B. It is estimated that quality of products will decrease in near future. | |
| 4. |
Process capability tests are a part of _____ step of DMAIC process.$ |
| A. | Define |
| B. | Improvement |
| C. | Measure |
| D. | Control |
| Answer» D. Control | |
| 5. |
DMAIC can be carried out without tollgate reviews. |
| A. | True |
| B. | False |
| Answer» C. | |
| 6. |
Projects with high potential negative impact are _____ |
| A. | Most desirable |
| B. | Least desirable |
| C. | Having highest risk |
| D. | Have a low risk |
| Answer» D. Have a low risk | |
| 7. |
Improve step of DMAIC can also be changed by Design step in the case of some processes? |
| A. | True |
| B. | False |
| Answer» B. False | |
| 8. |
Tollgate reviews are presented to managers and “owner” of a process, __________ in the six-sigma organizations.$ |
| A. | The project champions and the black belts not working directly on the project |
| B. | Industrial engineering team |
| C. | Quality control manager |
| D. | Developers of the factory |
| Answer» B. Industrial engineering team | |
| 9. |
PSP is expanded as ____ |
| A. | Problem Solving Process |
| B. | Product safeguarding process |
| C. | Product Sampling Process |
| D. | Project Settling Procedure |
| Answer» B. Product safeguarding process | |
| 10. |
DMAIC is often associated with ______ |
| A. | Six-sigma activities |
| B. | Kaizen board |
| C. | 5-s |
| D. | Acceptance sampling |
| Answer» B. Kaizen board | |
| 11. |
Which of these is not a part of Define step of DMAIC process? |
| A. | Verify and gain approval for final solutions |
| B. | Define critical customer requirements |
| C. | Establish project charter and build team |
| D. | Document process |
| Answer» B. Define critical customer requirements | |
| 12. |
What DMAIC process does is, to _______ |
| A. | Manufacture any product |
| B. | Define specification limits for a product |
| C. | Solve root cause of quality and process problems |
| D. | Define quality system standards |
| Answer» D. Define quality system standards | |
| 13. |
DMAIC stands for ______ |
| A. | Do-Measure-Act-Implement-Check |
| B. | Define-Measure-Act-Implement-Control |
| C. | Define-Measure-Analyze-Improve-Control |
| D. | Do-Measure-Analyze-Improve-Control |
| Answer» D. Do-Measure-Analyze-Improve-Control | |