MCQOPTIONS
Bookmark
Saved Bookmarks
→
Statistical Quality Control
→
Process Capability Analysis Using Histogram Probability Plot
→
Computer should not be used with SPC.
1.
Computer should not be used with SPC.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
Computer should not be used with SPC.
Which of these should be carried out if the process is in-control and capable?
When it is inconvenient to obtain more than one measurement per sample output of any process, which of these is the best choice?
Which of these does not require SPC implementation?
When there is a need to reduce acceptance-sampling or other downstream testing to a minimum when the process can be operated in-control, which type of control charts should be preferred?
When attributes charts are used when _______
When destructive testing is required, which type of control should be used?
When there are very tight specifications, overlapping assembly tolerances problems, which of the control charts are used?
When process needs to be controlled but the measurement data cannot be obtained, the control charts to be formed are _____________
When the process is a complex assembly operation, and the product quality can only be judged in terms of occurrence of nonconformities, the ______ are more helpful.
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply
Your experience on this site will be improved by allowing cookies. Read
Cookie Policy
Reject
Allow cookies