 
			 
			MCQOPTIONS
 Saved Bookmarks
				This section includes 15 Mcqs, each offering curated multiple-choice questions to sharpen your Statistical Quality Control knowledge and support exam preparation. Choose a topic below to get started.
| 1. | WHICH_OF_THESE_IS_NOT_A_MAJOR_USE_OF_THE_PCA_(PROCESS_CAPABILITY_ANALYSIS)??$ | 
| A. | Prediction of how well the process will hold the tolerances | 
| B. | Reduction of variability in process | 
| C. | Establishing an interval between sampling | 
| D. | Stating the need of the Acceptance sampling | 
| Answer» E. | |
| 2. | WHEN_WE_DON‚ÄÖ√Ñ√∂‚ÀÖ√Ë‚ÀÖ¬•T_HAVE_THE_MEAN,_SPREAD_AND_THE_SHAPE_OF_PROBABILITY_DISTRIBUTION_OF_ONE_CTQ_CHARACTERISTIC_OF_A_PROCESS,_WE_CAN_USE_____________FOR_PROCESS_CAPABILITY_ANALYSIS.?$# | 
| A. | Acceptance sampling | 
| B. | Design of experiment | 
| C. | p-chart | 
| D. | Specifications on the quality characteristic | 
| Answer» E. | |
| 3. | In product characterization, we cannot say anything about ____$ | 
| A. | Dynamic behavior of the process | 
| B. | Distribution of quality characteristic | 
| C. | Process yield | 
| D. | Fraction conforming to specifications | 
| Answer» B. Distribution of quality characteristic | |
| 4. | When in PCA, we have only the sample unit of product without any direct observation of the process or the time history of the production, the PCA is also called ____________$ | 
| A. | Product inspection | 
| B. | Product characterization | 
| C. | Product sampling | 
| D. | Process design | 
| Answer» C. Product sampling | |
| 5. | Process capability can be expressed as a percentage outside of the specifications. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 6. | Product characterization cannot be used for the determination of the state of the statistical control of the process by which, the products are made. | 
| A. | True | 
| B. | False | 
| Answer» B. False | |
| 7. | Which of these is not one of the primary techniques used to find out the process capability? | 
| A. | Histogram | 
| B. | Probability plots | 
| C. | Control charts | 
| D. | Acceptance sampling | 
| Answer» E. | |
| 8. | Which of these is not necessary to find the process capability? | 
| A. | Mean | 
| B. | Standard deviation | 
| C. | Spread | 
| D. | Design of Experiments | 
| Answer» E. | |
| 9. | 0.27 percent outside the normal tolerances can be obtained using ____________ | 
| A. | 6-sigma both sides of mean | 
| B. | 3-sigma both sides of mean | 
| C. | 2-sigma both sides of mean | 
| D. | 8-sigma both sides of mean | 
| Answer» C. 2-sigma both sides of mean | |
| 10. | μ – 3σ, is the LNTL for ______________$ | 
| A. | 3-sigma spread in distribution of CTQ characteristic | 
| B. | 1-sigma spread in distribution of CTQ characteristic | 
| C. | 6-sigma spread in distribution of CTQ characteristic | 
| D. | 4-sigma spread in distribution of CTQ characteristic | 
| Answer» D. 4-sigma spread in distribution of CTQ characteristic | |
| 11. | For a six–sigma spread in the distribution of the product quality characteristic, the upper natural control limit will fall at _____________$ | 
| A. | μ + 2σ | 
| B. | μ + 3σ | 
| C. | μ + 4σ | 
| D. | μ + 6σ | 
| Answer» C. ‚âà√≠¬¨‚à´ + 4‚âà√¨‚àö√¢ | |
| 12. | Which of these is used as the measure of process capability? | 
| A. | Process mean | 
| B. | Process standard deviation | 
| C. | Sample standard deviation | 
| D. | Six-sigma spread in the distribution of the product quality characteristic | 
| Answer» E. | |
| 13. | Determining process capability is an important part of _____________ step of DMAIC process. | 
| A. | Analyze | 
| B. | Define | 
| C. | Control | 
| D. | Measure | 
| Answer» B. Define | |
| 14. | The process of usage of statistical methods to determine the variability in a process and to reduce or completely eliminating the variability, is called ________________ | 
| A. | Process capability | 
| B. | Process capability Analysis | 
| C. | Process variability | 
| D. | Process variability analysis | 
| Answer» C. Process variability | |
| 15. | Process capability refers to ___________ | 
| A. | Changes in process | 
| B. | Variability in process | 
| C. | Uniformity in process | 
| D. | Unevenness in process | 
| Answer» D. Unevenness in process | |