1.

What is the dependency of the cost of the armature and field windings with respect to large number of poles?$

A. high cost for armature windings, low cost for field windings
B. high cost for armature windings, high cost for field windings
C. low cost for armature windings, high cost for field windings
D. low cost for armature windings, low cost for field windings
Answer» E.