

MCQOPTIONS
Saved Bookmarks
1. |
What is the dependency of the cost of the armature and field windings with respect to large number of poles? |
A. | high cost for armature windings, low cost for field windings |
B. | high cost for armature windings, high cost for field windings |
C. | low cost for armature windings, high cost for field windings |
D. | low cost for armature windings, low cost for field windings |
Answer» E. | |