1.

Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is Q1, and that of the precast driven pile is Q2, then which of the following is correct ?

A. Q1 > Q2
B. Q1 = Q2
C. Q1 < Q2
D. No specific comparison may hold good
Answer» B. Q1 = Q2


Discussion

No Comment Found

Related MCQs