

MCQOPTIONS
Saved Bookmarks
1. |
Two piles, one a bored cast-in-situ pile and another a precast driven pile, both of same length and diameter are constructed in a loose sand deposit. If the bearing capacity of the bored pile is Q1, and that of the precast driven pile is Q2, then which of the following is correct ? |
A. | Q1 > Q2 |
B. | Q1 = Q2 |
C. | Q1 < Q2 |
D. | No specific comparison may hold good |
Answer» B. Q1 = Q2 | |