Pavement Design
→
Bituminous Material Tests 1 in Pavement Design
→
The VDF for hilly terrain and initial traffic vol..
1.
The VDF for hilly terrain and initial traffic volume of 150-1500 CVPD is taken as 1.
A.
True
B.
False
Answer» C.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
What would be the thickness for the pavement if the CBR value of the soil is found out to be 20% and the traffic is estimated to be 4300 commercial vehicles per day?
Compute the pavement thickness using the equation for CBR value of 10%, wheel load of 4100 kg and tyre pressure of 6.5 kg/cm2.
A flexible pavement has 34505678.91 csa and a CBR value of 4%. What would be the thickness of the base course of the pavement?
The VDF for hilly terrain and initial traffic volume of 150-1500 CVPD is taken as 1.
What would be the csa for a two-lane divided pavement with the following details?Initial traffic in the year of completion, A = 3000 CVPDVehicle damage factor VDF, F = 4.5Design life, n = 20 yearsAnnual traffic growth rate, r = 5%
As per IRC 37-2012, only the total thickness of the pavement can be found out using the design charts.
Calculate the total thickness of the pavement using the equation given by US Corps of Engineers if the CBR value of the soil is 13%, the wheel load is 4100 kg and the tyre pressure is 6.5 kg/cm2.
The CBR value of the soil is found out to be 6% and the traffic is 350 commercial vehicles per day. Find the pavement thickness using design charts provided by IRC.
IRC 37-1984 redesigned the CBR charts based on ______
Determine the thickness of the pavement if the pavement is subjected to medium traffic and the CBR value is obtained as 7%.