Calculate the total thickness of the pavement using the equation given by US Corps of Engineers if the CBR value of the soil is 13%, the wheel load is 4100 kg and the tyre pressure is 6.5 kg/cm2. |
A. | Not possible |
B. | 0 |
C. | 18.74 cm |
D. | 1874 mm |
Answer» B. 0 | |