MCQOPTIONS
Bookmark
Saved Bookmarks
→
Highway Engineering
→
Embankment Subgrade in Highway Engineering
→
The temperature in Marshall’s method is _______..
1.
The temperature in Marshall’s method is __________
A.
25
B.
30
C.
35
D.
60
Answer» E.
Show Answer
Discussion
No Comment Found
Post Comment
Related MCQs
The number of blows in Marshalls test specimen is?
Marshall stability determines __________
The temperature in Marshall’s method is __________
The specified method for bitumen mix in India is?
Volume of mineral aggregate is?
The specific gravity of bitumen lies between __________
Maximum size of aggregate in surface course is?
Maximum size of aggregate in base course is?
Bleeding may be avoided by __________
Rutting may be avoided by __________
Reply to Comment
×
Name
*
Email
*
Comment
*
Submit Reply